tv [untitled] September 21, 2012 10:00pm-10:30pm PDT
10:00 pm
about earlier. >> i think the important thing too, we're at the planning phase in this rojt and work witching -- working in the parking communities and our staff. this shows the before and after, i do see the light towers on the after one which looks fine. i can see the synthetic turf looks like it's in place but this area in the foreground doesn't look different, i don't know if that was supposed to be a picnic area but it looks kind of wild there, i don't know what area that should be. >> we renovated the facility,
10:01 pm
the facility is bifurcated by about 20 feet plus or minus, we renovated the top part of the facility with a recreation center and a playground and it looks like we -- we're going to try to minimize maintenance and water use, that area is outside of our project, we're on the lower field level. >> it's not going to chaining -- change, as long as it's overgrown, other than that, i know it's not in scope of your project, that's why it looks the same before and after. >> they're trying to represent what the neighborhood is going to see rather than being right down on the field, it's supposed to be a representative viewpoint than someone passing by the park. >> commissioner hillis? >> a question, i think it's great, i think improving the fields we have and building new
10:02 pm
fields where we can is critically important. i think a lack of playing field is what we have. what percentage of the fields are currently turf and what's the plan, if you know, do you know the demand overall for fields and how many fields do we need in the city to meet demand? >> i wish i brought the permit director, i don't have those numbers at my finger trips, we are getting close to meeting real demand with regard to our program and ground sports play which is great. when i started my presentation, ground sports are escalating tremendously, we're having to turn kids away from sports teams, so square footage wide, i don't have those figures, today we've completed 16
10:03 pm
fields, five soccer fields at one park facility, so when i say 13, it's a little misleading, with regards to how many we're going do moving forward, you heard the beach l.a. project is still moving through its process, it's going to be the last field we're proposing as part of the city fields foundation so that will conclude that project, it will be an 8 year program, but moving through, i don't have a crystal ball, if you would like, i can muster up those figures so you can get a better understanding how this fits in the overall system. >> commissioner borden. >> i wanted to say based upon the issues you brought up, to the appellant, i believe the
10:04 pm
pmd did address them, the challenge with newer technologies, turf fields, cell phones, the truth is we don't know to a degree to scientific certainty, we hope the science is correct and the damage isn't what we think because obviously nobody wants to poison people, that's not the intent here, but based on was the acceptable science around what we know about this particular particulates, the environmental review did address them. we may not agree on what was lt+ hink ;bqp+mkwqk; understand that the technology on turf is getting better so there's new kinds of substances that are detrimental, we'll see more in time, but there's no way to
10:05 pm
mitigate environmental risks, there's always pollutants and arsenic in so much of our ecosystem and it's hard to know how much is a real problem, so i just wanted to address the appellant's concerns. >> thank you. >> is there a motion from the commissioners? >> commissioner borden? >> i move to uphold the pmd and deny the appeal fm >> second. >> commissioners, the motion on the floor is for upholding the prelim nation negative declaration thereby deny thing appeal on that motion, commissioner antonini? >> aye. >> commissioner borden? >> aye. >> commissioner moore? >> aye. >> thank you, commissioner sugaya? >> aye.
10:06 pm
>> commissioner wu >> aye. >> thank you, commissioners, the motion passed unanimously, commissioner, you are now on item number 15, 2011.0277c, 2750 jackson street. >> good afternoon, commissioners, i'm mary woods from the planning department, the conditional use before you for the council is required because of the expansion and it's seeking a planned unit development because it is greater than 1/2 acre, the project proposes an existing k through 8 private school for boys, the majority of the work consists of excavation for a new multi-purpose room and a renovation of existing facilities. the project will add approximately 19 thousand square feet to the existing 55
10:07 pm
thousand square feet for a total of 74 thousand square feet upon completion, the project requires modifications to the rear yard and parking requirements of the parking code. the sponsor is seeking a phase development in order to accommodate the academic year and fundraising for the proposed work. conditional use approval, this project if approved will be valid until 2021 or 9 years from now. a brief description of the three phases of construction includes phase 1 which involves window replacement at the back of the building, interior renovations, foundation and upgrade, and this work has started this summer. the next phase, phase 2 which is the bulk of the construction includes the excavation of the multi-purpose room below the
10:08 pm
existing athletic field, so even though you cannot see it but because it occupies the entire rear portion of the lot, it still needs a rear yard modification. phase 3 includes the remaining energy efficient and also window replacement on the east and south side and this phase is ant panted in 2018 through 2021, phase 2 is anticipated to happen in 2013 through 2015. the department's recommendation is approval with conditions. i have also added language on page 13 of the motion to include that the commission will also be adopting the final mitigated negative declaration for the project and also adopt the mitigation adopting program which is exhibit c in your
10:09 pm
packet materials. since last thursday's packet, i have received 8 letters of support from surrounding neighbors. this concludes my summary of the project. if you have any questions, i'm happy to answer. thank you. >> thank you. >> project sponsor, please. >> it's not real compatible, okay, that would be better. thank you. i appreciate it.
10:11 pm
>> you may want to use this mic. here. >> so, thank you, president fong, fellow commissioners, we appreciate your dedication to our city's betterment for physical condition, just to introduce myself, i'm mark miller, i'm a project sponsor for [inaudible] for boys, i'm a ceo of [inaudible] bank and i serve with the architectural principle in charge of the project, i'm a long-time san francisco resident, i would like to highlight a few critical reference points, town
10:12 pm
school needs more space for its enrollment, it approximates at 54 thousand gross square feet, this is short on california's regulations by about 30 to 40% depending on how you measure, town school also needs to modernize, the school has been existing on the site for 74 years, the last meaningful imprao*ufms in the 1980s, it dates the 1960s and prior, educational requirements have advanced since the construction of these facilities, town school's vision is a mor modern environment than just pure
10:13 pm
additional space. this project is the result of a ten year search and review of all the options throughout the city that have on-site improvement, expansion, splitting the school and all other sorts of options to get the education conditions appropriate for the school for the future, more than four years ago, the school revitalized and wanted fo expand, for three years, the school has worked with the faculty to determine educational requirements, during this time, the school has worked closely with the environment and bidding department with the city of san francisco to explore possibilities on this site and to be on top of the urban contract development issues, through this multiyear dialog, we've worked closely with the neighbors as a group, this project reflects this consensus.
10:14 pm
if i may, i want to outline some of the key points, we're 54 thousand feet, the proposal is 19 thousand square gross feet, to get to 34, 4 thousand square feet is above grade, that gives us basically 2 to three storeys horizontal addition. in questions, i can address the various ways we can make it happen, but the reddish gold environment that's going to be under the current, what we call the lower field in the northwest quadrant of the school, the 4 thousand additional square feet above grade is in this middle stripe to create a more efficient utilization of space. there is street improvements
10:15 pm
and it was mentioned facade improvements through scott and jackson street facade, these diagrams outline the scale, the red represents the multiuse facility, the blue represents the horizontal addition on jackson street which is perhaps a foot or two for the glass and maybe 4 to 6 feet of the [inaudible] all within the property line in that central core part of the building, that was the first and second floor, the third floor, we're zk%fíthe shape jackson street and we have playing field on the roof and to make that accessible, we are bringing the elevator up. the pv modifications, i wanted to highlight them, we made a proposal that's already been approved, with con sen witchy with the community and with the
10:16 pm
city to extend the loading zone for pickup and drop off, that has been approved and accomplished. the yellow represents the existing, the prior white zone, the green represents the new spaces that have been put into play approved in february of this year. the other calculation is on the open space, this is because of existing non-conforming ways that the site was originally set up, the open space calculation, if you use it in a situation that it requires, it's 11 thousand square feet, we currently have 23 thousand feet, we're adding an additional 1 thousand square feet on the roof. quickly and just briefly in
10:17 pm
section, you'll see where the excavation is for the multi-purpose facility, the section on the right is the existing condition, the blue shaded area is representing the massing of the new and the new section is there below, this is cutting through the south which is to my right to the north towards specific property owners to the left. the elevation along jackson street, the existing condition above where the horizontal work would be done, the central area is to accommodate the new core, the blue representing the glass and the taking off of the prechalet shall we call it and the elevations are there at the bottom. along jackson street, the existing photograph at the top, the existing section or existing elevation along jackson street -- scott street where the blue area is, you see the modest areas of addition and the new facade below.
10:18 pm
we're changing the look, we're trying to bring the school up to date visually, this is along jackson street, you can see the existing condition in the upper right, some material uses and moves are done by reference there by some examples on your right and this is the facade looking east. the centerpiece looking from the corner of scott and jackson street towards the new core, on the left, you see the existing condition, and on the right, what the school will look like. how we're doing mitigation in the glass, and that concludes my overall introduction to what we are trying to do in the exterior complex, thank you for your attention. >> is there any public comment on this item? >> good afternoon, president fong, members of the
10:19 pm
commission, i'm here on the next matter, but having been a town school parent for 11 consecutive years or 18 paid tuition years, and it ended a year ago, my boys had an exceptional experience at town school and it is a classic urban school recess on the roof, my boys now have recess on 700 acres where they're going to high school, anything you can do to exercise your discretion in favor of this school would be appreciated and i urge you to do that and i welcome this opportunity to say those things, thank you. >> thank you. >> any additional public comment? >> hello, i represent the six
10:20 pm
units and we live next door to town school and phase 1 happened this summer and it started at 7:00 in the morning and went to 7:00 at niekt monday through saturday, so we like town school, we like being the neighbors of town school and we want them to be able to do what they need to do to grow and for us, we'd like to be able to work with being their neighbors so for us, the problems was having it start at 7:00 in the morning and having it also be included on saturdays, so as a building, we ask that the construction go from 8:30 the 30 -- in the morning and go monday through friday, this summer, the cleanup that took place after the construction was just wash down the sidewalk to and in front of our building and we
10:21 pm
were hoping to have that addressed and then i read the report, but some of us also brought up concerns about the [inaudible] that was created in the summer and the next project is going to be on a much larger scale that some people had to leave the house because the dust was too much to handle so that was another concern, and that is it from 2409, thank you. >> thank you. >> additional public comment? >> i'm bruce ster ely, thank you for the opportunity to speak on behalf of town school's construction project, i am a 24 year-long head of the school. town itself is 74 years old and for most of that time, it's been located on the jackson
10:22 pm
street side, the academic addition to the school was completed in the 60s, the project we bring to your -- for your approval allows us to create educational spaces which better serves the needs for collaborative learning between students theses -- themselves and students and their teachers. we teach and lessons are developed, not from lecture, by experimentation. in fact, many of the classrooms that we are building are smaller in order to provide for seminar style academic conversations. poorly designed spaces such as obsolete internal stairways are revitalized, they will be enhanced by contempt prised
10:23 pm
school facility, while we are the elephant on the residential block, they are happy we are not increasing our foot fingerprint, grateful that we have been considerate neighbors for so long and understand our need to modernize the campus, a common neighborhood theme has been that the majority of homes neighboring the area have been renovated and it is town's logic to do the same. thank you for your time and consideration. >> hello, my name is louise and i'm an 8th grader at town school, the new and innovative design is beneficial to the students for a variety of reasons, my first example is the white boards, we have them on the walls and on big sliding doors, this allows us to collaborate more positively with one another, they provide
10:24 pm
more flexibility for one another for projects and studying, lastly are the classes themselves, now instead of it be teacher led learning, it's student led, the first phase of the renovation focused more on technological, scientific and mathematical aspects of the school, the second phase will be more involved around literary arts, and the dramatic arts, the project you are considering today will improve town school immensely for its students. thank you. >> thank you. >> good afternoon f, my name is nancy, !
10:25 pm
finance [inaudible] we are fortunate that our head of school had focused on maintaining good neighbor relations for the past 23 years, i want to provide a brief summary of outreach we have done with our neighbors. in 2011, we hosted three meetings with our neighbors which were attended by about 40 neighbors in total, the purpose of two of the meetings was for mark miller our architect to explain our project and to answer questions, the other meeting was a response from our neighbors to reduce the congestion during the morning drop off of students, from the request of those neighbors, we applied and received an extension of our zone to have four more cars, in the spring of 2012, mark miller and i
10:26 pm
spoke individually with the 8 neighbors who are behind the playfield to discuss our plans to excavate, all of these neighbors have expressed support either in writing or verbally for our approach to them and for the project itself. before the summer construction started, both the school and our general contractor wrote a letter to all of our neighbors within a two block radius to have school explaining what would be happening with the summer construction project and if they had any concerns, our construction superintendent was on site daily by 6 a.m., and they sent them away prior to 7 a.m. to minimize many noise on the street. i have as mary woods mentioned 8 letters from neighbors that i can read for the commission and
10:27 pm
thank you for your time. >> thank you. >> you can leave them on the bench. >> thank you. >> any additional public comment? seeing none, the public comment is closed. commissioner moore. >> i'm in support of this project, we've seen a lot of schools come before us where they've had to go beyond their footprint to expand and we've had issues of lost housing, i know it's never easy. the neighbor on scott street, i know the construction hours do start at 7 a.m., i have a project across the street from me, they start before 7 a.m., the noise is not supposed to happen before 7 a.m., they are out there, i wake up super early because they are already doing work and the 7, 7, 7 days
10:28 pm
a week, so you know, i believe -- if they can figure out a way to work with the neighbors, but i know it's the policy and it's a catch 22, if you shorten the hours, the construction takes longer and more months of dealing with the noise versus them having them do longer hours, i do want the project sponsor to address the issue about the sidewalk washing and ask, near the project where i'm here, they're spraying water to reduce the dust. >> first, i'll deal with the noise issue. this summer which was in the -- it was a fair comment, it was an aggressive 64 day very large interior project, that is not the intent of intensity or
10:29 pm
drawing that we were looking for, we have from a school year end to the start of the year after beginning, which is for us is more gracious, so you have a little more time and saturday's not going to be in the plan except major things that need to happen when traffic's very low with cranes, the dust is something we're conscious of, especially because of phase going forward because of there's lots of excavation, we're doing one way traffic through the sites, for noise primarily because of -- to not have backing up of trucks so working diligently on that, we have to work on other streets, we're cautious of that,