tv [untitled] January 5, 2013 10:30am-11:00am PST
10:30 am
they actually should retain a cohort, which they can find of hang out with and be together. that is what we're attempting to create with this whole construction hiring process as a way for them to still, like there are so many jobs in the city that are coming down the pike, we want to make sure that they have a network to stay connected with each other. so on that note we're working with san francisco unified school district, as well as integrating veterans pre-orientation programs there. as well as the sf state university veterans club to generate internship paths into construction employers like webcor, turner, dbs and other employers. we can start with the transbay project and then move forward from there. so it's kind of a multi-pronged approach and still a work in progress. working with the unions, as well as the building trades to make sure that we have got them all aligned and identifying existing veterans in the union first, followed by any possible
10:31 am
new-hires and beating the bushs to make sure that we get veterans integrated. kind of a lot to swallow, but i have a handout that outlines everything that we have done to-date. webcor obayashi has hired nine direct hire positions within our company. turner at the recent u.s. hornet career fair hired one and i think the key is developing the one-on-one relationships with the sourcing agencies to find the veterans that are out there and get them into internships or apprenticeship programs so they can be hired. so that is my summary. thanks. >> thank you. >> the one other item on the
10:32 am
veteran's report that i wanted to highlight was that enville buildings was awarded the hoisting contract for the project. so they are going to be providing the man lifts to bring personnel into the excavation and in future to the upper-levels of transit center construction and the personnel to operate those. and that is a disabled veteran-owned business. so both in the field as contractors we're making end roads. just a few words on our apprenticeship programs. i reported last month that webcor had developed two tracking reports that we have now been using over the last four months as both a means of reporting, but also feedback to the operators and the contractors, so that in
10:33 am
realtime they can make the adjustments necessary in the number of apprentices that they have on-site. the two reporting mechanisms for all crafts to achieve a 1:5 or 1:6 ratio of all workers, as apprentices. and you can see now that the crafts are achieving that and that is based on total hours worked. and then for operating engineers and for laborers, it's on a daily basis that we want to have a 1:4 ratio of apprentices to journeymen laborers. you can see there at the last few months, we have finally reached that point where those red lines representing the apprentices in the field are exceeding the apprenticeship
10:34 am
targets. so these tools that were developed have given us the ability to really monitor the payroll on a daily basis and make the adjustments necessary to make sure that we're having as many apprentices in the field as possible. that concludes my report on the pla. >> could you just ask bob, are we going to be able to start seeing trade by trade apprentice? >> we have that data now. >> at least for the bigger trades. i know for very small number it's hard to meet, but it would we good to get a sense of who is having more challenges. >> we can break that out, absolutely. >> thank you. >> good morning directors, steve with turner construction. another good period of work put
10:35 am
in place these last -- this last month. let's see if question get we can get this going. 561,000 craft hours through the end of november/early december. a little more than 11,000 since we last spoke. the hours represent about 160-200 workers in the field on any given day across multiple shifts that we're running. and later in the report, there is a tally. that is over a thousand unique jobs during the transit center construction including utilities. so that is craft people, a thousand craft people having worked or touched this project as reported in the certified payroll system. the sc contractor made their
10:36 am
milestone of 162 and actually completed 165 and is on track to finish on on-time. the excavation continues and the rains that we had a week or so ago slowed things down with a little mud at the bottom of the excavation, but it continues to move west to east and under fremont street is the next step. the access trestle was completed all the way to fremont street. so the contractors now have a construction roadway, so to speak all the way out to howard at the end of the west end of the project. the awss work continues on mission street. they were able to get an exemption from the holiday moratorium to allow them to continue that work. so we'll finish that early part of next if year as they work through
10:37 am
the holidays on mission continuing to put in the new water line. coming up next, the below-grade structure contractor who now has the geothermal and grounding contracts within their package will start that work in january. the buttress work will continue and the micro pile production, they completed 70 in the total production piles and that will hopefully be completed in the next 90 days and move into zone 2. of course the excavation will continue to work from west to east of the timeline update still remains the same.we're starting the below-grade package and superstructure package is out to bid and we'll get the results in early february. parts of the exterior packages will be going out with the window wall in 1st quarter/2nd
10:38 am
quarter of next year and beyond. so that is the timeline on the bse and the big thing is the excavation continuing from the west to the east. the final traffic bridges will now be done over a weekend in april, after needing a lot of space in the zone 4 area to put those bridges together. the contractor has chosen to wait until the buttress work -- a majority of the buttress work is completed. just an overhead, you can see that the trustle bridge is connected all the way to fremont street and the other areas continue to be under excavation and the buttress area at the east end. this gives you a breakdown of how the excavation is going. the dark photo, left side
10:39 am
indicates making the final depth and they are continuing that dealing with the de-watering aspects from the rain and moves from west to east. so just some perspectives of how things have changed. you can see how the trest the bridge is now connected. hard to tell, but the ab and c levels are in place in zones 1 and 2 and at far end, all the way down to the d level. just a shot of some of the excavation and bracing going on and the conditions which the contractor is working under right now in zone 1. micro piles continue. they have 70 completed to-date, or by the end of november. installing bracing, under the
10:40 am
1st street bridge between zones 2 and 3. completing the trestle in zone 3. and excavation and bracing in zone 3 as it progresses along. the end section, the east end section, zone 4 buttress work continues. as i said they met the milestone of 162 and actually had 165 completed and continuing to get 2.5 a week. up-to-date progress chart and you can see on the chart kept by the program management folks, the team was right on target for the completion of the buttress work. a couple of the buttresses being worked on over of the last period. the contractor has elected to put in a sheet pile cutoff wall in the north-south division on division between zones 2 and 3 on eastside of the fremont street.
10:41 am
this will allow them to start the excavation underneath the fremont street bridge and start moving into that zone 4 portion of that zone 4 excavation early before the completion of buttress work. so that shoring wall went in or that cutoff wall went in this last period and will allow them to start excavating under the bridge. the awss work continues. as i mentioned there is just a couple of shots of the work progressing on mission street and the integral work around the other utilitis in the streets. so next up is the substructure package as i mentioned. so we'll just walk through that real quick. the shoring walls are already completed. you might have seen the slides before, the water table. the next step is the micro piles and there are a total of close to 1800 of them, the length of the project, but as they are completed the contractor, who is starting with the grounding and geothermal in january, underneath this will be installing the 5' thick piece
10:42 am
of concrete. then the below-grade structure and the walls and the foundation or structural walls and of course, eventually we'll get the steel out there to the superstructure. just the overall budget, which remains consistent for the construction work that has let. this is the overall construction budget of commitments to-date-560,000 craft hours. and you can see here that san francisco labor still continues to hold at 20% throughout the project. these are just counting the utility hours and transit center construction hours. and again, there is that number, over a thousand craft jobs over the course of the start of the transit center work and utility work. if i can answer any questions? all right. thank you. >> thank you, directors, that
10:43 am
concludes my report. >> thank you. can we move on to the next item, please? >> yes item 6 is public comment, can which an opportunity for members of public to address the authority on matters that are not on today's calendar and gilbert deanza would like to address you. >> if there are any other members who wish to speak, if you could stand and speak after gilbert, thank you. >> good morning. madame chairman, board, maria, i am here to talk about the carpenters agreement with john o'connell. we recently signed an mou stating that the carpenter's union will hire students graduating from the john o'connell program. i am also a graduate of john o'connell and it's been a great
10:44 am
career for me. i think it's a great thing for the relationship we have formed with the school district. we met with october and signed the agreement in which five graduating students from john o'connell will come into direct entry into the carpenter's program and two of them will be females, which is great. and we're very excited about going forward with this. paula will be getting together with the john o'connell school and providing the curriculum in which the students graduating have direct entry into the carpenter's join. i also want to say that we'll be having a college and career awareness day next thursday, december 19th. so that is the late update with the carpenters thank you. >> where will that take place? >> ida b. wells high school next thursday. >> thank you so much. >> thank you so much, have a
10:45 am
great day. >> and if there are any other members of public that would like to speak, please do just line up. >> hi. i am jim patrick, patrick and company in san francisco. i want to go to the agreet agreement with heins. i would like to find out the bullet points. what are the responsibilities and deals made there? to the best of my knowledge is not a public record and wondering if it will be a public record ? thank you. >> thank you. if there are no other members of public that will like to speak, we'll close public comment at this time. [ gavel ] and we'll move on to the regular calendar. >> item no. 17 a presentation of the audited financial statements for the fiscal year ended june 30 120 [#20*-/] 12 and the report to the board of directors. >> thank you. >> and director sarah will
10:46 am
present this item. >> good morning again directors. you have been presented with our annual financial report and i am of course pleased that we have again received an unqualified clean opinion. i do want to acknowledge the other tjpa financial staff that you haven't met. they are not at our meetings, but they are instrumental in making sure that we maintain our financial symptom throughout the year and that we're able to produce these statements. and with, that i want to introduce our auditor ahmad >> i am the partner in charge of the audit. what you see here is the annual financial statement the tjpa. as required by government accounting standards board we are required to audit the financial statements and ensure that the financial statements are fairly presented. because you are a governmental agency as well, we do extra work as it relates to further
10:47 am
compliance because you are major recipients of federal grants, as well as the fact that we have to report in a separate opinion, internal control deficiencies and we're reported to report these items on the financial statements that you see here. what you really see in the financial statements is just basically a mirror of the financial statements that the management had presented to you. there were no audit adjustments, we didn't change any of those numbers and vouched them back to what we call external documents or external evidence, verifying that the financial information is fairly stated. as a mentioned before we're required to also report to you in these financial statements if we noted any non-compliance with laws and regulations and we noted no find of non-compliance
10:48 am
with laws and regulations. with the specific tests that we go into, we verify the compliance with the federal requirements so we know there are no exceptions. we look at the interrible controls internal controls and payroll internally and look the controls and we have noted no deficiencies in internal control. we are required to communicate to you whether we noted any difficultis in the performance of the audit or whether we noted a audit adjustments, which is the second letter in the package that you have. we noted -- we proposed no audit adjustments. management has been one step forward giving us all the financial information that we needed to complete our audit and for that we thank management staff. i would be happy to answer any questions? >> are there any questions? if not, thank you for the report and the presentation.
10:49 am
seeing no questions, can we move to our next and last item? >> yes. item no. 8 is the approval of the minutes of november 19, 2012 meeting. >> i have to abstain. >> we have a motion and a second. >> we'll take a roll call vote. director lloyd? >> aye. >> director mett kav? metcalf? >> aye. >> we'll have to carry this forward. >> so we'll take a motion to continue this item to the next board meeting. >> so moved. >> we have a motion and i believe we can do that -- >> what will change next time? >> the two will always abstain because they weren't here. >> i wasn't able to attend the meeting. >> what will change? >> i apologize.
10:50 am
>> so you may review the meeting minutes that are available online and confirm that the meeting minutes accurately reflect the activity. >> okay. >> >> so we have a motion to continue this item until january and we will do so without opposition. do we have any other items to review? >> that does conclude your agenda today. >> meeting adjourned and happy holidays to everybody. [ gavel ]
10:52 am
>> welcome to "culturewire." today we are at recology. they are celebrate 20 years of one of the most incredibly unique artist residency programs. we are here to learn more from one of the resident artists. welcome to the show, deborah. tell us how this program began 20 years ago. >> the program began 20 years ago. our founder was an environmentalist and an activist and an artist in the 1970's. she started these street sweeping campaigns in the city.
10:53 am
she started with kids. they had an exhibition at city hall. city officials heard about her efforts and they invited her to this facility. we thought it would coincide with our efforts to get folks to recycle, it is a great educational tool. since then, we have had 95 professional artists come through. >> how has the program changed over the years? how has the program -- what can the public has an artist engage with? >> for the most part, we worked with metal and wood, what you would expect from a program like ours. over the years, we tried to include artists and all types of mediums. conceptual artists, at installation, photographers, videographers. >> that has really expanded the program out. it is becoming so dynamic right now with your vision of
10:54 am
interesting artists in gauging here. why would an artist when to come here? >> mainly, access to the materials. we also give them a lot of support. when they start, it is an empty studio. they go out to the public area and -- we call it the big store. they go out shopping, take the materials that, and get to work. it is kind of like a reprieve, so they can really focus on their body of work. >> when you are talking about recology, do you have the only sculpture garden at the top? >> it is based on work that was done many years ago in new york. it is the only kind of structured, artist program. weit is beautiful. a lot of the plants you see were
10:55 am
pulled out of the garbage, and we use our compost to transplant them. the pathway is lined with rubble from the earthquake from the freeways we tour about 5000 people a year to our facility, adults and children. we talk about recycling and conservation. they can meet the artists. >> fantastic. let's go meet some of your current artists. here we are with lauren. can you tell us how long have been here so far and what you're working on? >> we started our residency on june 1, so we came into the studio then and spent most of the first couple weeks just digging around in the trash. i am continuing my body of work, kind of making these hand- embroidered objects from our day-to-day life. >> can you describe some of the things you have been making here? this is amazing.
10:56 am
>> i think i started a lot of my work about the qualities of light is in the weight. i have been thinking a lot about things floating through the air. it is also very windy down here. there is a piece of sheet music up there that i have embroidered third. there is a pamphlet about hearing dea -- nearing death. this is a dead rabbit. this is what i am working on now. this is a greeting card that i found, making it embroidered. it is for a very special friend. >> while we were looking at this, i glanced down and this is amazing, and it is on top of a book, it is ridiculous and amazing. >> i am interested in the serendipity of these still life compositions. when he got to the garbage and to see the arrangement of objects that is completely
10:57 am
spontaneous. it is probably one of the least thought of compositions. people are getting rid of this stuff. it holds no real value to them, because they're disposing of it. >> we're here in another recology studio with abel. what attracted you to apply for this special program? >> who would not want to come to the dump? but is the first question. for me, being in a situation that you're not comfortable in has always been the best. >> what materials were you immediately attracted to when you started and so what was available here? >> there are a lot of books. that is one of the thing that hits me the most. books are good for understanding, language, and art in general. also being a graphic designer, going straight to the magazines and seeing all this printed material being discarded has also been part of my work. of course, always wood or any
10:58 am
kind of plastic form or anything like that. >> job mr. some of the pieces you have made while you have been here. -- taught me through some of the pieces you have made while you have been here. >> the first thing that attracted me to this was the printed surface. it was actually a poster. it was a silk screen watercolor, about 8 feet long. in terms of the flatwork, i work with a lot of cloddish. so being able to cut into it come at into it, removed parts, it is part of the process of negotiating the final form. >> how do you jump from the two dimensional work that you create to the three-dimensional? maybe going back from the 3f to 2d. >> everything is in the process of becoming. things are never said or settled. the sculptures are being made while i am doing the collages,
10:59 am
and vice versa. it becomes a part of something else. there's always this figuring out of where things belong or where they could parapets something else. at the end goal is to possibly see one of these collage plans be built out and create a structure that reflects back into the flat work. >> thank you so much for allowing "culturewire" to visit this amazing facility and to learn more about the artists in residence program. is there anything you like our viewers to know? >> we have art exhibitions every four months, and a win by the public to come out. everybody is welcome to come out. we have food. sometimes we have gains and bands. it is great time. from june to september, we accept applications from bay area artists. we encouraged artists from all mediums to apply. we want as many artists from the bay area out here so they can bay area out here so they can have the same experience.
77 Views
IN COLLECTIONS
SFGTV: San Francisco Government Television Television Archive Television Archive News Search ServiceUploaded by TV Archive on