tv [untitled] July 19, 2013 3:00pm-3:31pm PDT
3:00 pm
sheltered location, it was a training for city disaster service workers from my agency to be trained in the red cross model on how to be a shelter worker. there are several levels of staff at the shelter and we're training to the basic level. the incident that we have talked to chip and other members of the mod about -- came from staff members within the red cross. so that is definitely a concern. it's being addressed. and additionally my responds to shelter -- when there's a disaster that will displace low income people from their housing, so such as a residential fire, if we open up a shelter here in the city, i'll make sure that i am at the
3:01 pm
shelter and i'm making sure that the needs of the most vulnerable residents are being addressed and we are doing so in a culturally confident linguisticly manner. so i appreciate the work that you folks have done. i share your concerns. we are moving forward and in september we are doing a tabletop exercise with the math care group for the city and county of san francisco that's going to be including mod and we'll have -- its going to be a tabletop exercise where we present several is a -- scenario and we're going to sit down with them and make sure the issues with those with disabled will be addressed. if you have
3:02 pm
questions, i'll be happy to answer them. >> are there any further comments? no. we're going to move onto information item number 9. summary report of upcoming 2014 and 2015 ada barrier removal facilities and status of current projects. presentation by john paul scott, deputy director for physical access, mayor's office on disability. >> thank you chair and council members. so this is my yearly update. we have an approved budget. what i'm going to do is for some of you who are new and haven't heard this presentation before is go over in general and very quickly what is our ada transition and talk about the big picture funding for the next fiscal years and go into specific projects that are being funded in this cycle. as you may know
3:03 pm
we have a plan that was dated in 2004, a dopted by the board of supervisors in 2007 and that is coordinated with the city's yearly capital process. that way we're at the table to be able to ask funding from the directors and the mayor's office and the board of of supervisors. it has moved into a two year cycle. it used to be yearly. our ada transition plan is to remove barriers within the city's buildings and facilities where we provide programs to the public. there are more than 600 facilities. these were surveyed back in 1999, 2000. and then from that we distilled which projects needed to have specific
3:04 pm
attention where, say, other departments such as the library were fully funded for building renovations and repairs through bond work. we pecked up the projects that weren't -- be picked up the projects that weren't going to benefit from those capital programs. so our goal is -- the ada transition plan is a uniform physical access strategy. it is a list of proposed design and construction projects, not program access. its goal is to do better than the minimum requirements of the ada and have accessible services through the facilities and opportunities for accessible employment. we do have an exception and that's the recreation and parks department which has over 40 sites and of course they've had over $700 million with the bond and gifts
3:05 pm
to renovate many of their facilities and that program is ongoing with the 2012 clean and safe parks bond. enter price departments are responsible for conducting ada improvements in their facilities like the library or mpa or the airport. that is where the bulk of the improves have occurred in the last 20 years. approximately $4 million in construction has occurred since the ada was passed and i'm not talking housing and streets and public right away. i'm talking about buildings. in this fund -- this funding has come from many sources, bonds, other mechanisms and from the general fund. mod, ada transition plan is a safety net. it catches projects that aren't going to
3:06 pm
be -- that aren't otherwise benefiting from those bond funds. let's see. our plan has -- had more than 55 projects. some of these have multiple sub projects like san francisco general hospital where we're doing 24 to 21 different sets of toilets and we have to space that project out into almost 15 building permits where we cannot do all the work at once. we have to be careful not to disrupt the operation of the hospital. we've done 15 medical clinics throughout the city. we are making improvements to three others at san francisco general hospital which were fully funded and we've got the permits from the state to do that work. we are currently doing work in four of the community art centers which i'll talk about those in a minute. we've done work in more than 10 other civic
3:07 pm
buildings including this building. and many of our projects we have to break apart in multiple years because we don't want to overburden of the funds and the capital program. we want to get our fair share, but not break the system. so in that way also we can be more strategic and ask for the design funding in one year and be able to do intelligent planning and get proper estimates than to ask for the construction funding the following year and if it's a very big project, just break it into two fiscal years of funding. so to date we have received 33 million $3,380,085,204 of funding, not including curb ramps and sidewalks. our original plan was $21 million. for fy 2013,
3:08 pm
that's january 2013 this month to june 2014, we are receiving 7 million $7,147,005. usually our funding was in about $4 million range, so we're doing very good this year in the years where we had the economic crisis. we were down to 2.5 million. for fiscal year 2015 from july 31 to june 16, we're received 4 $4,450,000. we'll have another funding request in fy 17 but it's much smaller because we're expecting to sunset off projects especially as we open up the new san francisco general hospital. so our total plan as it is today, i might ask for more, i always
3:09 pm
do is 46 million 1 hundred $46,177,371 which is really good. as i said we're looking to complete construction in 2016 especially as we're gearing up for the san francisco general hospital. that's a whole set of work that will happen at san francisco general. so now i'd like to go into the specific projects which are funded for the next two fiscal years. for the department of public health our funding is 5 $5,000,585,000. all of our work inside of the san francisco general hospital is completely funded by believe combrus years. so with this money, we're rebuilding the building nine entry court yard and ramp. we just finished building one entry ramp and
3:10 pm
this is parked -- planned to create an access infrastructure across the three blocks of the campus that's inside so you don't have to come out on patrell avenue. we're putting in a new ramp into building three and the car auditorium which is our main assembly space for public hearing. we're doing a study for a new pedestrian entry from patrell and 21st because right now you have to walk on the side of the block to get into 8090 or go upstairs or up a vehicle ramp and that's where the bulk of the clinics are in that building cluster. at lagoona honda, we're adding a ramp to the exterior court of the building. it's a ceremonial space but it's a place where they do outdoor gathering for the residents that live at that
3:11 pm
facility. we're doing ramps, sidewalks, hearing rooms and other improvements at 101 grove where we have the clinic, especially the rear sidewalk. i don't know if you've seen the hatch there. we've done the curb ramp. we got the final funding for the san francisco std clinic on 7th street and also for the elevator installation at the maxiseen health clinic. these jobs are designed and in drawing as we speak. we have the final funding for the renovation at the elevator and the elevator rehabilitation process in the homes. that's a $6 million project. building 8090
3:12 pm
building and we had elevators that was in critical need of renovation and that project is $4 .2 million. our 8090 elevators, we have our building permits and we certified the contract last week so we're happy. yay! for the arts commission, the council made priorities as to which project should we do first and which should come later down the pike and obviously public health and human services were important. it's hard to do work inside of san francisco general hospital so we knew we had a long ark of projects there. we finished up our projects in civic buildings so we're moving into the arts commission chlts we've done work at the african american cultural center and we're finishing up at the second
3:13 pm
floor restroom in the children's area and we're working on the mission cultural center for latina arts and some arts which is in south market. we received the design funding last year so these next two years, we obtained the construction funding. last year, by the way, we received $600,000 to help fund the bay view opera house renovation and they're received another million dollars of the general fund this year for the outdoor plaza. this is one of the projects where we lever ourselves and we put money on the table where very a $4 million project. this is the case with the clinic. they
3:14 pm
created a $3 million -- we're trying to be smart with lever ageing with other departments and we've had good relations with the department of public health. another project that we're funding this year is some -- ada transition plan at the youth guidance center. this one fell off radar. we thought it was taken care of it and it turned out it wasn't done to our expectation so we did the master planning for the ada transition plan for the building and this upcoming year we're receiving $400,000 to do all the design construction drawings and cost estimating in contracts and then $2 million to do the actual construction work next fiscal year. but at present we're spending $600,000 in this building to renovate the elevators because they're in bad shape and also to put in
3:15 pm
a wheelchair lift at the front entry which has a set of stairs. they come up this steep ramp into the entry lobby. go figure. we've been assisting the department with access ability improvements out of the law cabin ranch for boys and we're not having to put in money, we're putting in our expertise and we've guided the construction crews to make their dorms and the restrooms and the gym accessible and that's being done by our department of public work staff at bbr. for the human service agency, as i said we did work for them earlier in the project, but we're coming back with $200,000 for next fiscal years to do maintenance of
3:16 pm
accessible futures at three homeless shelter. that work is undefined. we'll go in there and make an assessment as to what we need to do to polish these facilities and get them back in shape and hopefully that will be enough funds for us to do directly with bbr rather than going out to the long contract process. we've started another program with the recreation and parks department. they obviously have been very successful in getting public bonds since we had the 2000 clean and safe pond and the 2008 bond which is $185,000 and when you look at the other funding sources from states grants, that brings them up to 750,000,000 since 2000. there's things that we found so
3:17 pm
we're working with them to create a fund to zero in on these particular issues or things that need maintenance of accessible features and working with them hand and hand to hand select these projects that had the greatest need that aren't benefiting from these projects that are in the bond. so we're being given half a million this year and $1.5 million next year and the park department is getting matching funds for $1.1 million during this period. and just to tell you a few of them is -- one is the sharon arts stud s studio. we need to clean up how you get into the building. the golden gate park senior center which had accessible improvements done way in the early 1980s and they
3:18 pm
need to be brought up and that's a busy center. and another example are the asphalt still lake pass. the tree roots are popping up so we want to get that back in shape and as well as other things at golden gate park. in addition to this, we've obviously if you've been out in front of a civic center plaza, you've seen our pavement settlement, we know that the plaza has not received a good maintenance program so we've worked with recreation and parks department and the department of public works to do the initial studies and we've gotten recreation parks department to be awarded $1.5 million to do the work over the next two years to fix that pavement. so that's the big picture. this is what we've been awarded. as i said this is for the next fiscal
3:19 pm
years, that's $11.5 million. with matching funds we're easily at 15 with ada improvements that's separate from construction jobs. okay. any questions? >> thank you very much. council members, chip. >> yes, please. hi john paul. this was a comprehensive report and a lot of numbers flying around, but i was -- i wanted to ask about the general hospital situation. will that entire campus be ada compliant when you're finished with this or certain buildings? >> we have many different programs going on at the same time. some of the buildings are 1920s and there's no way to make them completely ada compliant. so what we have to
3:20 pm
do is burial removal. where we have public services, programs for the public, we're bringing those all into accessibility. the patient rooms will move to the new hospital and all of those have useable, accessibility. there's full patient rooms. we're leaving, for example, the mental health services so we're going in there to make accessible showers and toilets as apart of our work. the university of california is doing work. they're spending millions of dollars at the statement time but they focus their money on where they have their training programs because that's a training hospital and so -- we're able to get a lot of other public functions made accessible by them. so when you look at it, we're not going to have a truly ada compliant
3:21 pm
facility. that will be billions of dollars but we'll have an accessible building. just building five and putting in toilets, we're trying to be very strategic in what we're doing so we're not putting a toilet in that will become someone's office. we know that clinics will migrate in, so we want to make sure that the toilets we're doing right now becomes the public toilet through that clinic. it's crafty work, but we're very happy with how things are going. it has taken a lot of work. we started on this in 2004. >> am i correct in hearing that you the patient experience of general hospital will improve greatly? >> yes. >> that is the first priority? >> yes. >> okay. thank you. >> we want to be able to create accessible working environments
3:22 pm
as well. >> is there any more council members? seeing that there's no council members, staff. >> thank you i just like to make maybe two quick comments. one is that i think we all lost a little bit of ground during the economic down turn and the city had to reset some priorities at that time, but i really do feel with the recent commitment to the capital planning program that the city has really stepped up to fund this very important work at the levels that are necessary and i think that is due really in large part to john paul advocacy and also his incredibly efficient project management. i've spoken to the planning staff and they see the mod projects actually as a model for how you should
3:23 pm
identify a project, then do a feasible study and then the design and the construction so you really move a project over multiple years, but always with the best of information so that you get the best bang for your buck so i want to thank you john paul scott for your really excellent work on this project. >> is there anyone on the bridge line? >> no. >> thank you very much. is there any public comment? >> i'm walter park again. a question more than a comment. glad to here about the comprehensiveness about this. ada was passed in 1990 and the law said three years and we're probably going to be done
3:24 pm
first. my question -- i'm not sure why money is going into recreation and park seeming that they have $60 million for capital expenditures. there's entire states that don't have that much money for capital spending over a decade and it doesn't focus on the lowest income people of low income. what's happening with curbs. we're nine years into a ten year plan, i'm sure there was a cut back since 2008 and it's a disaster, but how far are we from finishing that and when do we expect the curb grounds to be up to specks? thanks. >> for the chair, is it okay if i make a brief answer on that to public comment? >> it's a very good point that
3:25 pm
you raise mr. park about the curb grant program. and i think the curb grant program could take up a very large agenda report and i like to suggest to the council that we consider that at one of your executive meeting to have a complete presentation on the curb ramp program, but just some numbers. we did have the economic down turn but after the 2008 down turn we had a paving bond and the paving bond was of three years duration and including curb ramps not only as streets are repaved because when you go through an intersection and you repave you have the obligation to upgrade all the curb ramps at that
3:26 pm
intersection. but they're ada funded that's driven by our request that we receive from members of the public and physically from members of the public with disabilities and the funding over three years was running approximately $4.5 million just for the mod, ada transition plan work and the actual amount for curb ramp construction was far greater than that of magnitudes of three or four so i would appreciate a more comprehensive report coming from the recreation and we'll provide information to tell you how long it will take to complete this project. >> my recollection there were 22,000 curb ramp either installations or modification. it's my looking at dpw website, they got a number of $35,000. my question is more about the
3:27 pm
numbers of curb ramps that are complying and non comply nothing the dollar amount. the dollar amounts are the largest single public works project in this. it's probably $2 million. >> rather than engaging in public comment, i can insure you when we put those reports that you've requested, you'll see the magnitude of the process made and the trajectory of how we're going to reach our final goal of having curb ramps at every single corner >> thanks. >> thank you. is there any more public comment? okay. seeing that there is no more public comment, we would just like to have public comment on
3:28 pm
any item on the -- not on the agenda today but within the jurisdiction of the mod. so is there any public comment. yes. please. come on walter. >> i was going to show you a picture but i probably won't find it in the next ten seconds. as long as i'm here i might as well use my time widely. >> amen. >> an issue that is emerging is electric vehicle charging stations. they're kind of not very visible yet because they've gotten a few thousand electrical vehicles in california but the plan is to have millions as soon as possible and we do also have thousands of electrical charges
3:29 pm
places in california which shocks me. and san francisco has got a ton of them. we have them right out front of course and in civic center garage and all our ucf campuses and all over the place. they're not accessible. the machine itself, you know, there's a kind of a post, it has what has a hose sticking out the side and that's the connection. the machine i think it fine. i think the manufacturer has done their fact and it's easy to use for someone in a wheelchair. i don't think we're talking about blind people and others with disabilities, however the charging all happens in parking spaces. state govern's office of opr which is the office of planning and research produced a guideline which doesn't
3:30 pm
really require the ada minimum nor does it address california building code minimum for parking spaces or for any special feature that the public uses either in a private accommodation or in something that is city funded. the ones out front, look at them when you leave. there's three. there's no place for someone to get out of their car or van because they're regular sized parking space without accessible parking spaces. the code i read have to provide accessibility and we have an odd situation right here that the sidewalk slants down right at the edge as you're approaching karlton street from the underground parking lot that's underneath that parking lot. there's a curb