tv   [untitled]    January 6, 2014 4:00pm-4:31pm PST

4:00 pm
sources. the objectives is to capitalized and diverse this portfolio and increase the use of local water outdoors and would he do reduce our dependence on surface water supplies. this slide is a one side snapshot i'll try to walk through the component. first, it proposes to pump an average of 4 million gallows a day in the western part of san francisco. and what we will do is blend those waterfront with our recreational water conspiracy at 2 of our reservoirs those are in blue our sunset reservoirs is the largest one.
4:01 pm
then after blending this wlentd ground water would be distributed throughout san francisco and the blue areas of the map show you the detects area is 60 percent of san francisco would receive this blend. the 2krb9d blended water would still maintain our high quality standards that the puc striefdz to meet. in doing that that would exposed all the regulatory standards. let me back up. in terms of facilities we're proposing 6 windshields or well facilities the project would be constructed in two-phase. phase one includes 4 of the wells and those are shown as the
4:02 pm
orange circle on the map and phase it would be converting two existing irrigation supply wells at the end of the golden gate park those are by the yellow triangles. it includes $5 million of underground pipeline that connect the well water the ground water to sunset reservoir. so jumped ahead i'm sorry. so item 16-c that you'll hear is about the coastal zone permit application that was made for 3 of the facilities and the 3 facilities that are located in the costly zone are the 2 at the end of golden gate park park that's the two triangles and the lake facility and the other facility in the coastal zone is the lake merced facility. i'd like to focus a minute on
4:03 pm
some of the details of the 3 facilities and the coastal zone. the south windmill replacement facility that's located at the southwest end of dprp off of 34k9 junior drive are that would replace the existing well facility the fingerprint of our new facility would be approximately the same size as the exit facility. it would be relatively small one story building of 8 hundred square feet and the height would be about 19 feet. the north lake facility the other one in golden gate park is located near fulton and 42 avenue. it would replace an existing irrigation facility and the
4:04 pm
fingerprint would be 9 hundred i won't tell and believe height of 13 and a half feet. and finally, the lake merced facility is off our assets road from the pump states. it's generally not assessable to the public but the facility will overlook along the lake merced area and will fats west so from lake merced facility it will be in the background. this building fingerprint will be about 2 thousand square feet with 19 and a half feet in height. that's a high-level overview of the project and if you have any
4:05 pm
questions, i'll be happy to answer them and thank you for your attention and wish you a happy holiday season >> thank you. >> i'm tim johnson with the san francisco planning department. a copy of the draft certification eir certification memo is before you. because we tended to bring this to you la 90 month there's some dates we'll correct. the defrost eir was published on miracle 13. a public hearing was held before this body on april 14th. the comment period closed on april 30th and the comments to respond to the document was published and distributed on october 30th, 2013. the elevations didn't find that
4:06 pm
the mremths of the project would directly result in visible effects but because this is part of the improvement water system the project would contribute to the invaluable program impact and it can't be - this significant level impact is related to growth emancipation proclamation document. due to the projects contribution to this un plaza valuable program impact the puc would have to adapt a statement pursuant to the california poly actress. should the puc choose to approve the project. the staff remedies that the
4:07 pm
consent of the report a adequate and accurate and the procures for which the eir comply with the sequa and the sequa guidelines and chapter 31 of the administrator code. that concludes my presentation. unless we have questions >> thank you. we may have questions in a little while. no public comment. okay. then commissioners. commissioner antonini. >> i believe i brought this up i want to reiterate the fact my understanding is that the water would be drawn when available that if there's a situations where we have a year where we have not had enough rainfall and our lakes are in jeopardy like
4:08 pm
lake merced we would be drawing it when it's available. there's some years when the heavy radiance we have a surplus of water. i understand that's what we have in mind >> correct the mitigation measures that we have identified in the eir do alleyway allow the project to mitigate impacts could less than significant levels concluding impacts on lake merced. and this myths measure envisions a step wise prove that where shall the organization would redistribute pumping and maybe sees pumping until the conditions improve so the water is maintained to significant levels. there's a detailed monitoring
4:09 pm
regime that going along with the mitigates measure >> thank you and the other question i have but your wells that are in golden gate park is this going to take advantage of the windmills that are operable. i think we did the dutch one recently and it looks pretty good but it doesn't do any pulling it sounds like something to explore >> i'm sure they'll taxing but they're not proposing anything. >> commissioner sugaya. >> yeah. i move to certify of the eir. >> second. >> i actually don't have a conflict that i commissioners, if there's no other comment there's a motion and second. commissioner antonini. commissioner borden arrest
4:10 pm
commissioner hillis. commissioner sugaya. and commissioner wu >> so moved, commissioners, that motion passes unanimously and place you an items 4. the san francisco 6 adaptation of finding under the california environmental quality act of gentle referral and request for permit authorization and a mike smith. so mr. gillman gave you guys a go presentation. i'm going to skip to the necessary stuff. 3 of the sites are located with within the city's coastal zone the lake merced and the south wind facility and the north wind facility. pursuant to planning code
4:11 pm
section 330 the that planning zone application is required as the project site is located within the coastal zone boundary. the project is appeal able to the commission because it's a major works project. the lake merced facility is currently in an undeveloped area adjacent to the access road that is off of lake merced boulevard it's the entrance to the pump station. the south windmill site is located at the western end of the golden gate park that's occupied by an existing well petroleum station while the surrounded area is used by the rec and park and contains stock appeals of concrete and other debris. the north lake well site also
4:12 pm
open western combrp is currently occupied by an existing well station. the site is surround by trees and bounded by fulton to the north. the proposed wall facilities within golden gate park will replace rec and park irrigation windshields and as such, they don't - the windshields will occupy the same windshields. the south windmill replacement facility is within the site of the former richard treatment plant that was largely removed in 1996. the proposed lake merced will not effect the visiting because they will have the voibltd from the road which is lake merced.
4:13 pm
and it will have green roof. the property lake merced site will not adversely effect the lake merced resources that is located in an area that doesn't provide any raeblg use next to the existing pimp station. it who access any local trails or docks. staff received two calls from the neighbors regarding the project neither of which expressed on a opinion only interests. you must - as part of the approval you must adapt the sequa finding related to the eir and there's a jeopardy plan referral motion included and lastly a coastal permit motion
4:14 pm
was attached the e rp if you have any questions, we'll be happy to answer them >> any public comment on those 3 items. seeing none, public comment is clos closed. commissioner sugaya. >> underlines there's other comments i'm going to move to approve all 3 under the california quality act. the general plan referral request for 0 zone permit >> second. >> oh, sorry. commissioner antonini >> yeah. i think this is a good plan and helping to augment our needs that was presented earlier. we have a lot of restrictions on
4:15 pm
the other uses from the lakes in the sierra and we're trying to implement more storage as we know to be able to address our problems in years they're maybe driveway years but the additional water that could be obtained from the city and county of san francisco and so long as the effects are mitigated on the environment and that makes sense because san francisco has the lottery per capita of any places in california. but sometimes we're at the expense of our greenery we're putting in a lot of dry stuff it doesn't look good. maybe we can get a better allocate and use water in a more traditionally way if we're
4:16 pm
providing 4 million glands. i know the system is a part of the plan and i understand the economics involved but certainly i'm hoping the city and a parks can be well-handled to get enough water to keep them green. commissioner sugaya. >> yeah. i made a motion but i have a request. on the south windmill site the map identified the ground sdurngs in red and extended all the way to your site and ant into the area that's already been acquit disturbed. i also observed the proposed native grass plantings will be
4:17 pm
in an unlimited area. is there some activity your coordinating with the department of rec and park to actually make improvement to that desire area then just around your facility? we don't have any formal activity that we are coordinating with rec and park both departments are well aware. process actually of drafting and memoranda of understand for the project that governors the access and obligation of both party. maintaining is that as part of the bond issue that was passed also november 2012 for recreation and park improvements one of those activities the rec and park want to improve that
4:18 pm
jeopardy area in golden gate park. but it's their responsibility to move forward first with that >> thank you. i wanted to ask that because my firm has some improvement with the murphy windmill and hits restoration so it's been american people eyesore. >> (laughter). >> to put that mildly. >> walk a few steps away and energy this moonlight environment so encourage the rec and park department to do something. >> commissioner antonini. >> just a followup to my easily remarks just on the usage of the water within san francisco. i want to employment how nicely the rewrite has been landscaped and how neat and clean it looks
4:19 pm
it's a well done project. but i'm less enthusiastic about the green areas to the east. their getting better but maybe a little bit better of management of the launders would be a big compliment. i'm not sure i like the bed grass on sunset you boulevard it turns out brown and kachdz garage so maybe we can cut that and manage it better. that's agenda for another day but having arthur a little bit of extra water helps >> please call the question. >> on the matter of the consideration of dalmatian of the finding there was a motion and acceptance to prove in the confrontational zone permit authorization. >> commissioner antonini. >> commissioner borden. >> commissioner hillis. commissioner moore. commissioner sugaya and lt. governor guadagno.
4:20 pm
so moved, commissioners, that motion passes announcements 6 to zero >> commissioners item 17 csa was continued and will place you on that 18 abc at is 15 hundred request for a condition. >> excuse me. should we tack - take a 5 minute break.
4:21 pm
less than 5 minutes. >> okay welcome to san francisco planning commission regular meeting. we're in the process of calling items 18 abc. at the 1500 page street request for conditional use authorization >> good afternoon. i'm with the department staff. as the project team has a presentation i'll obey belief. the item before you is a hifkd resource to create one hundred percent of housing projects in conjunction with the mayors housing. it would convert unit. the existing building covers approximately 90 percent of the area and as a result, many requirement can't be met because
4:22 pm
of the existing complnts. the building has been vacant for a number of years. the disappointment are for the conditional use authorization. the proposed su d was presented to the board by supervisor breed. it has removal of the parking and setbacks and the area of open spaces and the dimension requirement. it's to implement the f u d and the los angeles administrative code to affordable housing of a ratio of less than one to one. in 19899 the board of supervisors approved an ordinance to race the bulk limit on the property.
4:23 pm
this project didn't move forward and they've extraordinary. the resolution ordinance includes language to delete the f u d and change the height back. with regard this is for a certificate of determination. on december 18th the department issued a new certify to clarify the project description and as part of this the commission more than that the certificate into the case documents. today's action on this frontage include approval of the use authorization and approval of intent to recommend that the board of supervisors pass this and make modifications to the planning code. thank you if you have any questions, we'll be happy to answer them >> thank you. opening it up for public comment
4:24 pm
- project sponsor my ielgdz. i'm tim dunn. >> as many of you know mercy housing is a nonprofit developer and owner of affordable housing in san francisco. we have about 32 buildings in san francisco and about 35 hundred unit here. we want to service the comboishd housing for seniors and persons with disability and formerly homeless. we're excited to present our proposal and thank you for your consideration today. after a year and a half of community oppose we're proud to have the support of the properties of adjacent neighbors and the community and the organizations in the neighborhood. at 15 hundred painstaking it will be provided by nonprofit organization that serves the 12 mentally disabled.
4:25 pm
i'm going to turn it over to describe it >> you just leave the doors alone not touch them if the people leaning up against the walls could refrain from preys the bottoms woeg we'll be fine. >> i'm going to turn it over to to let them describe their program and followed by paul let to you talk about the roomgs. thank you >> hi, i'm joey work for san francisco are. i've worked for the arc inform 24 years. we provide services for people with disability. about 90 of those cloys we help them live individually. san francisco is a great place
4:26 pm
to live if you have a develop mental disable. our services have come to a groind halt everyone our housing unit have not helped as many as we like. this project provides 16 hundred individual to tack a huge leap in independents and i know from what i've seen and the conditions that our clients live in moving into this new or else situation they would not take advantage of the opportunity to live there >> thank you. >> good afternoon, commissioners and a director ram.
4:27 pm
illicit pault i'd like to run briefly through the project. can we put the power point up on the screen >> oh, thank you. so the project is located on the map south of the panhandle our this is an existing site plan you can see the project and on the right and page street on the bottom. the existing building has a side yard above it is used for parking and off of page street that's use for parking. this is a view looking at the exciting building it's a handsome brishlg brick believe. we're looking northwest towards golden gate park. you can barely see a quarter
4:28 pm
entry on the building. this is from the front facade from ma south africa. this is the exit side yard it will be creating a primary entry for the building. the new existing site plan as i mentioned at the took up above the knowledge will be providing a new entry the quarter entry will rain as a second entry and what is used as parking will be a residence. in addition we're filling in the street trees to get more of a continuous. development of entire of the
4:29 pm
this is preliminary community fit facilities and lobby community room and office for the arc and mercy on the ground floor in addition to the land uses on the right hand. the upstairs 3 stories will be developed spot 17 units of housing. the exterior of the building is going to be simply restored will be observing painting and replacing reply brick and on the lower right hand the new entry gate which will bring you into the new entry along masonic. and on page street the stained glass window targeted did right hand side of the building will be restored and a new sitting incubate on the left side of the
4:30 pm
building. so we've certainly welcome any additional question that concludes my presentation >> thank you. okay. now >> thank you good afternoon, commissioners. conor for supervisor breed. xhoed introduced the suction u d and i want to talk about that that's an project that is great. they got the support of the hate ash bureau council and while the hate ash bureau association didn't exactly speak dirge about it >> we appreciate our approval openin u