that. so if they've done that i don't know why we're asked to meet here. they don't want to communicate with us for some reason. the last time they dug out there someone spent a quarter of a million dollars. they don't have a letter. they need to submit this as part of the permit it's a public document and we would like to talk to the engineer they've figured a way to drive over a 6 inch step but they can't change the drawing if they've got a drawing we'd love to see it. eddy is correct you can't make copies of the microfilm. we'll e people need to be
1:01 am
submitting the 0 plan so everyone gets to see what's submit. they need to go along with the plan. the attachment would have been on the second floor when i went down and checked this morning. they zoo don't have the record for a completely different type of foundation. the soil is incredibly lose dune standing sand. we're asking for a continuance and hopefully, they'll talk to us and figure out a way to give us the 24 inches they agreed with. >> gentleman if i be, look at this letter i want it back tonight. mr. duffey anything further.
1:02 am
i'm sorry. i'll hear from the permit holder next. we're ready for your rebuttal. 6 minutes >> i know things might have been done but again we're discussing the same privilege they want 24 inches from the bottom we're willing to give that to them. in those plans they were submitted to disallow before that meeting at the building department. before we submitted we called them again and said fine. we met that day it showed 24 inches. fine we'll label the section this is the copy of the approved
1:03 am
plans that specifically show the 24 inches from the bottom of they're under pinning. i showed them back to a him and he agreed. he didn't say anything he look at it and we preceded with our application and the next thing we heard was an appeal. so again, i have to grant to them that we've been trying to - they have not happened the way they should have one hundred percent on their part. the meat of the problem is the 24 inches. we don't want to see this drug on another 3 months. now the fact that this foundation for the type of soils i'm not a sole loose engineer
1:04 am
but the opinions that mines before you have a standard foundation which was a little bit deeper so you're spreading the forces of the building on specific areas. n this map foundation and my engineer can correct me if i am wrong. this provides a more steadier foundation and if you want to require a new report it would be point less but the map foundation spreads the weight more evenly on that soil. 24 is better defined than the previous one. thank you. and here's the previous plans >> you want to show us on the
1:05 am
overhead? just the relevant portion >> bring it down. >> excuse me. but you've presented to the commission? >> ho >> hold it this way. >> got it? yeah, so we're looking at this wall section number 3 for the cross section occurs. this 24 was put in there by myself with the authorization of tim sullivan. after i marked it i shimmed does
1:06 am
this satisfy our concerns we're building less than 24 inches he didn't make any comments so i don't know if he agreed or disagreed. so the next thing we heard is an appeal >> have those approved. >> yes. >> so were they restamped again. >> we hadn't started the permitting process yet we met with the gentleman to make sure he was okay with the information as shown on there. he then at that moment pointed out it wasn't clear so i asked if i add those dimensions would that satisfy and he said, yes. and i showed it to him and like
1:07 am
i said he didn't express any way mr. whether in agreement or not. we went upstairs and got the plans approved >> okay. thank you. unless someone asks you a question. we're ready for mr. duffey >> sorry commissioners. when you start off with a jurisdiction request i think we're jumping from the third and back i take it confusing i'll try my best as well. i want to say one of the comments he wants the permit resented for appeal number 8 a which was permit application
1:08 am
2017167. that's a permit to obtain a final spriks for the application which is for the underpinning protection for soil. they said the work was bun done and never got to signed off and now they're saying they're going to get it finished. and there's outstanding plans. it was part of the plan for the underpinning occurred whether it was at the rear of the site or on the south property line or north property line it needs to get closed out. i'm assuming the work got done
1:09 am
but i wouldn't want the permit rescinded so for that one i'm not sure maybe the permit holder can speak to that and answer was the work done and he needs to get it signed off in 2014. and i'll available for questions on anything else. >> you said they're still outstanding the permits for 9508. >> in 2005 because the site got excavate. not only 2512 there was one - there were 3 properties involved. that's why they needed underpinning permits.
1:10 am
those are the permits that were taken out around that time. as far as 2512 their work was done that's not a problem but this is one of the permits open this site there was some underpinning protection for soil excavation that was done i assume to mitigate the problem and it's cleaning up old permits and that's good >> but the appellant has indicated they think the work was not completed. >> that's what they said. >> the permit holder says that's completed. >> we would go out to the site the appellant would schedule an
1:11 am
inspection and we typically go to the site the building inspector shows up and a wants to say see the permit for 2005 and wants to see what that was and make sure it's done. and that's what we sign off on the new renewal permits >> but based on the photographs that were provided shows the spray-painted rough = vacationed that were shown. this whole area has been back filed >> i'm not sure i think that area is a back filed it was for 2512 for the foundation under the appellants foundation. this permit we're talk about open this appeal number 8 a i'm
1:12 am
not sure where on the site the plans aren't here. i will tell you on those underpinning photographs sometimes something happens in between and we need to give them a permit right away but 134 that sometimes happens it's a permit that needs to get taken kevin >> that was permit 275. yes, it's 250179 accounting oath it's for soiles evaluation on 19th avenue. it's not one of the adjacent properties they must have had to do something for excavation and
1:13 am
without the plans it's hard for me to tell but it sounds like it is something that needs to be done >> yeah. this whole thing is not totally clear. based on what i know about the case the appellants case has been under pinned >> yes. in their opinion it has - i saw the permit it's closed out and completed. >> and the underpinning was done by the permit holder or is so. >> i believe so they agreed to have that happen i think i read that in one of the briefs. >> so if it needs to be i'm willing to spend time to meet them again, if we need to continue it or revolve it
1:14 am
tonight. i think the main comment is that the appellant didn't have a problem with the structure they need to figure out the depth and what this 24 inches is about. it's a pity theier we here tonight it would have been helpful for everyone. there's a letter i saw for the first time that everything was okay >> okay. and we have a engineer in dbi i can offer to have that person going go in i have no problem with that either. >> okay. >> commissioners unless you have questions for the parties. >> i have a couple of questions for the parties.
1:15 am
mr. leo this permits said shows 24 inches. >> no. if i went to the building - and the drawings that they showed us showed 24 inches >> the drawings show 24 inches, however, the permit that said that i -- i looked at on the fourth floor at dbi the changes was made by image i am going by handwritten form so what's presented here tonight is not the same my you're concerned that if this drops below 24 inches it is going to sewer charging. >> it's not sewer charging the most critical time is during -
1:16 am
>> during construction. >> when we open up, you know, to meet their 14 plus 2 plus 5 then basically, it puts the underpinning another risk. so once you put everything he together then you do have the confinement >> that issue has nothing to do with a mat or spread foundation. >> no. >> thank you. >> thank you. clear as mud >> pretty much. it sounds like we need to
1:17 am
continue it to let dbi sort of so sort it out there's no way we can do it tonight. there only concern is the 24 inches and if we can continue it to clear up the set that the dbi indicates 24 inches wouldn't that be okay >> that's how i understand. we could take the following. we could deal with this tonight and condition it >> we could do that. >> and could condition on the following basis. >> could we do t it in order. >> i remind we deny jurisdiction. >> i concur and we condition the main permit which is of concern in the following way
1:18 am
one, if they agree and this is had an agreement to provide the permit section. secondly, if they agreed to do 24 inches in their agreement that's a condition. i'd want the department then to deal with it. i'm not interested in dealing with their questions on structural design for a mat versus a spread that's up to the department to review. but if those two were conditions that both parties agreed to then we should do it and let the department do its work >> motion. >> yeah. i'll entertain that motion. >> you want to make it. >> go for it. >> commissioner fung is that
1:19 am
for 8 a and b. >> and 7 is a separate motion. >> i'm saying in terms of the conditions. >> i'm not likely to and i think there's subset i want to do that in order. >> item 7. >> i'm willing to move we deny jurisdiction. >> so on that motion to deny the jurisdiction president hwang commissioner hurtado sxhvdz commissioner honda. thank you. the vote is 5 to zero and the jurisdiction is denied no appeal is available >> he let me see if i can craft this. i'm going to move that we grant the appeal >> both appeals. >> both appeals and uphold the
1:20 am
permit with the following conditions: one is that the construction permit set of drawings be provided to the appellant, and two, that the agreed upon 24 inches between the bottom of their footing and the bottom of the under pinning be maintained as per dbis review. >> to reflect on the drawings that - >> it doesn't matter it's a condition that's required now. >> could you restate just the item two for me, the condition two. >> yeah. >> would you do that. >> between bottom of permit holders footing.
1:21 am
the bottom of permit holders new footing >> between - >> and the bottom of the installed underpinning of appellants property. >> the bottom of installed underpinning of appellants property. >> right. >> okay. i think - and is that clear mr. duffey. you're going to have to advantage this. that's why we pay them the big money >> sorry i don't want to delay this. there's a 24 inch plan to the bottom of the adjacent body >> on those plans. we heard earlier on the agreement >> i'm 99 percent sure so and so go out together. p you have two sets of plans we
1:22 am
give you one plan i don't know the opportunity to defer >> let's make sure they have the same thing. >> they physically change it on the spot. >> they can change it with the department as they go through the platoon reviews. >> it would be on both sets of plans. >> there's ancient history. >> you want 24 inches on the bottom of the new footing to the adjacent footing on the - >> the underpinning. >> on 9 underpinning the 24 inches. that's fine i think they added sand and gravel in there but authenticity separate. i think that's what it is >> maybe condition 2 has been
1:23 am
satisfied dbi will - >> if they do it on conditions we have to have a special conditions that's the process. >> you mean is 5 drawings. >> yeah. any condition that changes the plan like this side requires a special conditions permit. now, mr. duffey is saying 24 it would be redundant in a way but if it satisfies the appellant we can do a redundant special conditions permit >> let's pit this to rest can we do that. >> it would be - >> okay. >> so the motion is from commissioner fung to uphold both permits and on conditions that
1:24 am
the appellant be given a copy of the financial construction plans and a further condition that the agreed upon 24 inches to the bottom of the installed underpinning of appellants property. >> be maintained. >> yeah. 24 be maintained. on that monoxide to uphold both permits president hwang. you commissioner hurtado. commissioner lazarus. commissioner honda. thank you. the vote is 5 to zero and those permits are u78 i upheld with the conditions >> thank you, commissioners there's no further business. thank you. we're
1:26 am
♪ >> i am so looking forward to the street fair tomorrow. >> it is in the mission, how are we going to get there? we are not driving. >> well what do you suggest? >> there are a lot of great transportation choices in the city and there is one place to find them all, sfnta.com. >> sfmta.com. >> it is the walking parking, and riding muni and it is all here in one place. >> sitting in front of my computer waiting transportation options that is not exactly how i want to spend my saturday
1:27 am
night. >> the new sfmta.com is mobile friendly, it works great on a tablet, smart phone or a lap top, it is built to go wherever we go. >> cool. >> but, let's just take the same route tomorrow that we always take, okay? >> it might be much more fun to ride our bikes. >> i am going to be way too tired to ride all the way home. >> okay, how about this, we can ride our bikes there and then we can take muni home and it even shows us how to take the bikes on the bus, so simple right here on my phone. >> neat. we can finish making travel plans over dinner, now let's go eat. >> how about about that organic vegan gluten free rest rft. >> can't we go to the food truck. >> do you want to walk or take a taxi. >> there is an alert right here telling us there is heavy traffic in soma. >> let's walk there and then
1:28 am
take a taxi or muni back. >> that new website gives us a lot of options. >> it sure does and we can use it again next weekend when we go to see the giants. there is a new destination section on the website that shows us how to get to at&t park. >> there is a section, and account alerts and information on parking and all kinds of stuff, it is so easy to use that even you can use it. >> that is smart. >> are you giving me a compliment. >> i think that i am. >> wow, thanks. >> now you can buy dinner. sfmta.com. access useful information, any
1:30 am
this is the san francisco municipal transportation agency and parking authority. please call roll >> brinkman present. heinecke present. director lee. lee present that were director nolan. present director rubke. present. present mr. chairman and directors you have a quorum. thank you. i'm asking you to silence all electronic devises. their prohibited at the meeting
62 Views
IN COLLECTIONS
SFGTV: San Francisco Government Television Television Archive Television Archive News Search ServiceUploaded by TV Archive on