Skip to main content

tv   [untitled]    January 25, 2014 5:30pm-6:01pm PST

5:30 pm
>> sxhavg. commissioner levitan. commissioner low. commissioner mcdonnell and commissioner president buell and congratulations >> that's correct very much (clapping.) we're now going to proceed with vice president is there anyone who wants to open the nomination for vice president. >> so moved. all in favor, say i. opposed? okay. the nominations are open for vice president anyone wish to make a nomination >> i would like to nominate commissioner low for the seat of vice president. >> great. >> okay. any other nominations. move to close income taxes >> and a second. commissioner bonilla. commissioner harrison.
5:31 pm
commissioner levitan. xhoe commissioner mcdonnell and commissioner president buell. congratulations commissioner low (clapping) so before we - well, no go ahead make our comments >> i want to thank my fellow commissioners and say what a pleasure is to work with you and i want to congratulate commissioner low on staying as vice president of the commission. thank you >> i lived like to echo those remarks and it's a pleasure to be working with this commission and tell commissioner president buell i'll be happy to be his joe biden. >> thanks joe. >> so after that we need to go back and redo it i forgot to ask
5:32 pm
if there's any public comment on this. >> it's okay. no any public comment? let's make a vote for president >> i'd love to a nominate commissioner president buell. >> and a second. >> and again roll call. >> commissioner bonilla. commissioner harrison. commissioner levitan. commissioner low. commissioner mcdonnell and commissioner president buell >> and then for vice president is there a motion for vice president? >> yes. i'd like to move to commissioner low be voted for vice president. >> is there a second. >> second. >> commissioner bonilla. sxhavg. commissioner levitan. commissioner low. commissioner mcdonnell and commissioner president buell. okay congratulations again >> thank you very much. i apologize. we are now on item 7 the san
5:33 pm
francisco zoo. >> good afternoon, commissioners my name is a wayne reading i'm the cfo of the san francisco zero. i'll make the presentation for the zoo today. i'm extremely happy we had a record attention with over 75 thousand visitor and we also had included in that number ten thousand for the zoo lights program that we started last year. and experienced a lot of rain and somewhat limited attendance.
5:34 pm
it was a great event for the family and friends of the zoo. our attendance for the most was 71 percent over budget with 79 thousand visitor. we are at 4 hundred and 4910 visitors it's over budget by 044 thousand 10 visitors we exceeded last year's numbers by 13.3 percent and our 13 thousand plus visitors. since the society is all about the animal world i want to share
5:35 pm
pictures of our birds. those birds are local and in my opinion extremely beautiful with their various feature colors. they're all in a family known as the paparazzi their across from the chimcy places. the newest zoo residents are a pair of bong gals they belong to the mountain species and located in the low land and it is estimated there are one hundred remaining in the wild. i looked that up and iron of the
5:36 pm
reference points said one hundred and another one hundred and 40 i'm not sure but there are certainly evenly discharged in the wild we've received a one 1/2-year-old female and one-year-old meal the zoo and awe quorums has a breeding remedies for those two animals and we hope when they're ready eventually we will have an offspring the gestation period is 9 months. i'll add which is important to us is that the captive breeding program has unsuccessful released 2 dozens of those animals both the wild so the breeding in zoos throughout the
5:37 pm
world generate the new offspring and sometimes you, put them back into the wild and sometimes, it's difficult. in this case these animals have done well going back do into the wild. your latest traveling exhibit that will on january 25th is called the upon that on scoop and it's an investigation of poop and how animals and humans choose to use it. it's a fun family exhibit to learner about the digest active system we've found our visitors enjoy those exhibits their entertaining and educational. i will image we'll get a lot of comments the children love that
5:38 pm
exhibit and it pulls visitors into the zoo. when you have time come to the zoo and enjoy our wonderful exhibits that concludes my presentation. thank you very much >> any public comment on this item? seeing none, public comment is closed. commissioner president buell >> i'm sorry commissioner levitan has a comment. >> i took my daughters to the zoo and one of the few benefits of this lack of rain is how spectacular it is you're doing a wonderful job. that new playground is amazing and people seem so happy. keep doing the work you're doing. thank you >> okay we're now on item 8 which is mission renovation and
5:39 pm
allocation of bond contingency funds. >> good afternoon commissioner president buell and a commissioners. i'm with the capital and planning distribution this is for a resolution awarding a construction contract for $12 million plus to al ton construction incorporated in approving the allocation of contingency you funds for the parks bond for the project. on june 20th, 2013, the commission topped a mitigation monitoring program and it was approved the conceptal design.
5:40 pm
we're there 3 and a half years since i was assigned to the project over 2 years of community planning and a year and a half of negotiating with the review processed. we were able to bring the conceptual design before you in june of last year. 3 months after that in late september or early october the project went out to bid and we have a responsible bidder. i've had conversations and several of you are familiar with the bond locate construction they'll do 50 percent of the work the park raemgsz itself. the construction will start in march and last 14 months it will be phased the first seven months the park will be closed the
5:41 pm
north part and then the south part. i've been working with the operation of the park to insure the raementsz will be smooth. it's technically complex. i do want to not despite some of the complexities the department of that concludes my presentation were extraordinarily helpful. in terms of the contingency dollars the biggest reason for the additional publicity needed is the result of the change in the economy and the cost escalation we've seen prices go up 10 to thirty percent in construction because of the incompetent. the project as overwhelming
5:42 pm
budgeted was to close the entire park but that's not going to work so that's increased the schedule 3 months if you have any questions, i'll be happy to answer them but we've reviewed the concept plan in the past it includes everything we've discussed in terms of the improvements to the park. >> thank you. >> can we here any public comment? >> i would see is there any public comment? seeing none, public comment is closed. >> commissioner low. >> jake can you walk us through the project budget what was the original amount we were estimating and walk us through the allocation of the contingency. >> so the original budget tor
5:43 pm
the mission delores in the 2008 bond was $13.2 million and 1.5 was split off for the hell on project in 2009. we had $11.2 million including the 7 passenger door .9 was for construction the one before you is 4 point - 3.5 of that is directly related to the delay >> for a million dollars. >> yes. >> 3.5 of the 3.4. the additional 89 hundred thousand is just in terms of the construction dollars the easily e easiest way was for the restroom that was not a piece
5:44 pm
that was scoped. as we began it became clear we needed to prepare for restrooms because of the intense use of the parks. how much over budget have we been >> about $6,000 over. >> it's more like 4 hundred there's a 4.4 gap in just the purely construction dollars that 4 hundred thousand between 4.8 and 4.4 that's primary been any time. >> the fields and the glaze. >> so 4.4 is the hard cost. >> yes. >> additional hard cost not the offer run but the additional 4 about the 4 hard cost. >> yes. >> can you comment there was some reference in the materials to lbe subsidy contracting what
5:45 pm
what that all about. >> i'm not sure. well, we lost there was a bid protest by bachman they protested every border this was a lower bidder than them and the city attorney's determined those with frivolous >> so the the confirmation was that the construction did attempt to change the sub contract amount at the time of the bid what was that all about. >> which page is that on? i'm reading the memo by the office of the city administrator
5:46 pm
contracting division >> uh-huh. >> which item? >> regarding the bachman bid protests. >> while that is true what happened it's true that while the there was an issue with the numbers in one of al tons in one it was that bachman had lodged that containment and a even though it was true that that particular lbe subcontractor that etc., e even if you throw that bid out because bowman is also an lbe contractor al tons bid was so much over the required percentage that by throwing it out al stone was still consistent.
5:47 pm
that was the concern for us we were concerned we would have to throw out the bids but we didn't have to redo that >> thank you. any other questions? and we've >> we've asked for any public comment? i've told we need to approve the resolution and the secretary is going to - >> read part of that into the record. >> but this the for the approval of the allocation in contingency fund from the 2008 clean and save bond. >> motion to approve. >> moved and seconded all in favor, say i. >> okay. and just for the the rec and park hereby awards the construction contract number 307 that z in the amount of
5:48 pm
$3 million plus to al ton construction the lowest responsive responsible bidder for the mission deploring recreation project and in contingency funds from the 2008 for the mission delores park rehabilitation project. >> thank you commissioner president buell. i want to say a few words in recognition of jake. there probably has been no nor complex process. you know, rivaling maybe more complex than the project at beach o lay. i can honestly say as long as it's taken we wouldn't be standing here today approving
5:49 pm
this contract getting ready to breaking ground but for jake's skill and patience and creativity and problem solving and dawn deserves an incredible amount of credit. this is tricky. you would have thought it giving away $12 million to easy >> it's probably a good thing. >> so jake we're talking about golden gate park being the heart of the city. everybody has not just an opinion but a heightened opinion about what happens in delores peculiar park. the city should be very, very appreciative >> you have the city's you
5:50 pm
gratitude. >> so do we need a motion. >> no. you already did that. >> never do. >> on the open space contingency reserve. >> the item before you discussion and possible agency to allocate $200,000 for the contingency reserve for the camp. the background this year, the department p will celebrate the camp experience in the high serra. it is a beautiful environment setting from the density of the urban life. every year the department
5:51 pm
undertakes the camp fats. our year to year maintenance in include enhancement. with the 2014 being the camp madding arrest the department proposes to have a limited rage to enhance the enjoyment. on the initiative of commissioner mcdonnell and commissioner bonilla the department requests that the commission allocate $200,000 to the commissioners portion of the open space fund contingency refers to fund the improvements at the camp. the first one is a ropes challenge course and we're rirment allocation of one hundred and 5 thousand dollars. it is proposed for a wooded site next to the lake.
5:52 pm
on the overhead here a on top of 0 google map of the camp madding arrest property. it's a little bit shiny but there's brooks it's a a wooded area right about here for the courses. we're working with a nonprofit corporation called project adventure they're known as a trainer of ropes challenge courses and outside activities and they're the whops who have done the initial design for us. the challenge courses has a beginner and intermedal and this is by age. for example, youth on the
5:53 pm
inheritance section and adults on ability. each courses has a high and low elements with the high elements built into the existing trees. rope installation and equipment like helmets and training to certify the camp staff to organize the programming. if you like i have a short video if you want it's like a 1 minute video so i can show you.
5:54 pm
sorry. technical difficulties. this element is called the damage go trio. >>trio. >> there we go. it came up. and the obtain of this element is 2, 3, 4 or 5 participate they
5:55 pm
climb the ladder and it's depended that on the emotional support and ♪ ♪ ♪ ♪ ♪ ♪ ♪ ♪ ♪ ♪
5:56 pm
♪ >> actually i'll cut it there the other one is a swing element but they've got 15 to 19 high and low elements on the high elements you're on a a rope and, of course, if you've done rope it's emphasizing teamwork and coordination both for small group team building or large group team building it's an exciting addition to the course over and over. and 24 thousand to renovate the camp barn. last year the puc agreed to turnover a prehistoric building that is next to the flag pole for a camp activity site.
5:57 pm
the puc used this barn as a storage site for cable and for the extra about her stage we we installed a floor. this will support an electrical supply window replacement and rustic citing the barn will be a great area for teen activity and senior activities and expand our program during increment weather during the camp season we've proposed 24 thousand to the camp photographs and interpret delays. we villaraigosa a picture for the construction of the damn into a weather proof format and
5:58 pm
install those photos throughout the camp and some will be installed permanently and the main interpretative photo mats will be installed in the dinging hall it will support 50 small photos 18 by thirty and 32 large photos and interpretative delays in a type of size for a total of one hundred and 32, you know, items to put around the various buildings and especially celebrate the 90 years of the camp being operational. 29 thousand is for kitchen combachlts. this is nor the last if you camp season we want to install a kids
5:59 pm
food station as part of the expansion of the dining haul. there will be food for all kids. having this option will allow the kitchen to be more creative and it's not bound by a single menu and it will have more i'm sorry support this expanded operation. lastly we propose allocations of 20 thousand for the irrigation repair and lawn retaliation. it's the hub of the camp during any given camp week and consequentially it has to be in
6:00 pm
pertaining pretty good use important over several years the turf has declined in spots and noted more attendance are attention. the fire fighting effort on the rim fire may have broken some of the lines of the irrigation it will help repair the irrigation rates and replace the turf areas and complete t the areas to the 2014 camp season. that's our proposed allocation for the money we're requesting from you today and within the open space fund there's a fund balance of $14,621 within the commissioners reserve. you can see