Skip to main content

tv   [untitled]    November 26, 2014 7:00pm-7:31pm PST

7:00 pm
operators on both the rail and bus side we want to revisit those locations every operator will makes relieve will make the relief in a location there's a supervisor or manager that can answer questions and give them combines as to what might be going on in the system those are some right of short term actions we're doing to deal with the service and capacity issues you mentioned the vehicle side of it we have improved the maintenance program and looking at the preventive maintenance skefldz making them better fit the mime of the fleet and created a strong qualify assurance we've doubled the number of rail parts we're focusing on doing the
7:01 pm
prevent of preventive maintenance and with our support we look at the report on the cars they need work constantly some of them maybe here as long as 10 years we need to focus on the key systems that are failing and ata any muni riders knows occasionally you, you see waters dripping down on you and the cause of that is basically, the cooling system has not been replaced in over 10 years that's one of the things we need to focus on and focus on the doors and finally on this one we need to leverage newest facility and muni on third and 25th it got the most room and the most potential we've started the process to build that out and
7:02 pm
make it a full service maintenance facility some of what has happened this is not a reason to stop and applaud but this is a good trend typical mean distance between failure it's a trend you're starting off low and moving in the right direction it's might have and consistent we should continue that and get even better by focusing our maintenance programs on things like doors and steps and propulsion that represents the majority of details again, we can't get the new cars here soon enough but we have almost two years the public is excited they realize the potential for the cars on our outreach process to ask for input on 3 factors most
7:03 pm
importantly the comparison configuration got own 9 thousand responses we met looker-on the design we'll have that done by the end of the year some of the key systems integration issues we'll work through them and we want to move forward and make sure we stay on schedule to have the first car coming in december of 2016 and really in terms of transformation was it maples not just new, new is sometimes not better in this case it's spectacularly better standpoint we even though up the procurement we looked at with 2 hundred and 60 cars long term contract and great communications from the signage
7:04 pm
to the announcement standpoint by most importantly from a performance level you see the current l l r v what the proposed siemens they're a whole new generations and whole new way of doing business and great maintenance practice and great savings for the maintenance and reduced the time of details and maintenance because of the location of the components and the modules vs. the old ones we're excited we feel that we'll really help us meet the needs of the future and really begin the process to make us what we believe will be the premier of the light rail system in the u.s. with that, i thank yourself time and happy to answer questions. >> great. thank you very much
7:05 pm
so you know we clearly have a path in terms of the new vehicles that are arriving i know that the agency is doing more and more to try to keep those vehicles in shape and keep a higher percentage of them in operation to increase our reliability and again, we have seen results sometimes the result are up and down i know earlier in the year there was accident and now more vehicles s are coming in so i guess the question is how this all sounds good but how can we avoid slipping obviously only so much control over accidents you train the operators to drive correctly
7:06 pm
but with the best driving there's going to be accidents and mechanic problems and given the small margin of error then we have with the l l r vs how can you maximize the chances of not slipping back again and also in the context of growing ridership like bart and caltrain and b c a is growing it's ridership our population is growing where people want to ride transit so in two or three years from now more people trying to get on the trains than now and before the siemens arrive you can't expand the vehicles how should we be thinking about that. >> a couple of things on the vehicle side how to keep the car
7:07 pm
count up and reliability we focus on first of all, on the reliability side euphoric number one you don't look at our maintenance prevented active maintenance it is mileage based and the number of miles going up as ridership goimz goes up there will be expected to be more service in the next couple of years it's important that the inspections be done on time and correctly and thoroughly so it gets really to good supervision or first level supervision that the investments we make and the benefits on over halls are driven at the components such doors and computation that are failing the most where the trucks where the brake we need to focus those forevers the
7:08 pm
schedules are very important we need to do more work on the schedules because we're do have to schedule to what we have in the capacity and having a full compliment of operators who are putting service on the streets give us more flexibility in that regard but the scheduling and the detailed recovery strategy, if you will, it becomes very important and better supervision financially i'll say the other thing we're looking at and have the pilot going on which is critical to follow the city processes sometime and the acquisition of parts can be a long process especially, when you have vehicles like ours where many of the parts are no longer made and have to be mustards or purchased from say a
7:09 pm
supplier that's not close to san francisco we've undertake a pilot program for better planning and focus our inventory that helps those kinds of things but most importantly from our standpoint the management and the supervision and the instant attention to keeping the service out there and making sure that we do our inspections and organ our workforce so we get work done in an efficient manner. >> okay. i guess another question is when the first wave of siemens l l vs arrive in 2016 i believe and 2016. >> 24 or 28. >> 24 starting in december 2016
7:10 pm
to 2018 and the t line the central subway in 2018. >> 2019. >> so those vehicles will be dedicated to the central subway or - >> no, we don't do that with our real cars we operate the system because all of the lines go through the subway they'll be by the times, if you will, there's be substantial mileage so on any line in the system. >> at one point we were told the first wave would be the central subway but that's not the case as you no, it isn't the central subway will pay for a small autumn but not speculated
7:11 pm
to the subway. >> so once the central subway opens the t lines like the other lines will be siemens. >> yes. >> will they be able to link together or vehicles that are multiple car. >> they can mechanically couple so as opposed to training lining if it's a two car train you'll see the power systems and lighting through the two cars siemens will not be able to do that but if say awe probate were to break down and siemens were coming up they have the ability to come up to tow or push so in that sense you'll not see a mixed fleet. >> so in 2015 we see the first
7:12 pm
one that are roll call into service. >> yes. early 2017 and we'll have 3 cars on the property so theoretically a 3 car train. >> okay supervisor kim any questions. >> okay. thank you very much, sir. >> any public comment on item 4 seeing none, public comment is closed okay. so sir, thank you and to the agency i know this is challenging aspect of the system but incredibly important and do everything we can to maximum misses the vehicles until the cars arrive with that, could we then continue or actually why not a motion to file item 4
7:13 pm
we'll take that without objection. we'll file item 4 madam clerk call item 5. >> item 57 an ordinance mit the planning code and this is supported by supervisor chiu i'd like to add my name a co-sponsor to item 5 and aaron starr from the planning department t is here. >> thank you, supervisors aaron starr for the affairs the planning department item is before you to allow nor exemptions from the height limit for mechanic equipment on hospitals the proposed ordinance will ply to the structures with regard to height and the structures will have equipment without limitations as long as the following new equipment that can't be honoree the exposure
7:14 pm
and minimal endorse and necessary for the function of the building and no other feasible all of the elements the office stipulates that any outdated equipment must be removed prior to installation requested by the city of san francisco their burn center in the bay area can update it's treatment facilities and comply with the state protections the department thanks supervisor chiu for taking up the sponsoring it was heard by the planning commission over october 13th and adapted by. >> unanimous vote that concludes my presentation. >> thank you mr. star any questions and okay public comment on item 5 seeing none, public comment is closed and can i have a motion to
7:15 pm
forward item 5 to the full board with a positive recommendation. >> so moved. >> we'll take that without objection. that's the order madam clerk, any other business before this committee? >> there's no further business. >> then we're adjourned thank you
7:16 pm
7:17 pm
7:18 pm
leaders. >> hi everyone i'm patrick the director of earthquake safety
7:19 pm
forever for the stoifbl and we have the ryan white fair to teach people about the made sure soft story ordinance and connect them with the services they need you can save thousands of lives and if those buildings are rooiftd people will be allowed to sleep in their own beds while the city is recovering. >> we're here at the earthquake ryan white center for people to comply with the ryan white or do a ryan white on their property to connect with the resources they need.
7:20 pm
i came here wondering what to do as a owner of an apartment building moderate to comply with the must rules that went into effect last year >> we don't want to go to 10 different events people said so we advise people of the event. so we try to be incentive not everyone is going to be able to come 0 so this fans the afternoon and the einstein >> i've decided to be here it's amazing to see all those people's here it's critical to be prepared and to recover from disasters as finishing as
7:21 pm
possible. >> i've been to a lot of shows and this one was a trufk turnout a. >> since the structure the building represents the super structure the lower part of this particle on the buildings on the corner they shack quite a bit. >> so for the floors above as shaking that top floor is fog go-go have no more mass and we saw in 1984 more structure destruction where we're ryan white this by adding a steel frame typically you want to brass in both directions and see how strong the building is. >> we've adapted a thirty year implementation program i worry
7:22 pm
about that was a retrofit requirement this is what we do to mitigate the shom and have's evacuation for the people and our partners. i had questions about what kind of professionals are involved in this i want to start to put together a team of people to help me get through this. i'm a structural engineer and i'm thrilled at the quality of the contractors and engineers >> we've taken one civic awesome and put all the vendors in one place. >> you have financing and engineers and contractor and they come here and every we're rebuilding are that the office of the city of administer and
7:23 pm
the depth thought i environment and other partners. >> all those things one little piece of a resilient piece of - >> and i felt more positive about things i thought about how to pay for this. >> we didn't want to have one financing option it didn't work. >> we found information about financing they are different options for different types property owners. >> we've seen them offering financially and a pool of styles for a complicated way of saying they'll be able to pay back their loans over the next two
7:24 pm
years. >> we have 3 options and secondly, to get a loan for the ryan white and the third becoming in the past program participants in that. it is encouraged along coastal easier where we have set time like sand and a high water table to a cause the sand to shake i'm going to get this visitation on the same bridge you'll see the water come to the surface this knocks the foundation over and pushes out the ruptured pipeline >> it is intimidating i'm
7:25 pm
talking to people as a layman who needs help. >> this is a difficult process for people to navigate we're only focused on outreach so we've got the informational and we've spoken to many different owner groups and community groups all across the city. >> outreach is critical for the retrofitting program the city has to get out to the community and help people said what they have to do and do it and raise finances so this program is an advocate and resource for the community. >> so why not skip to the theme. foremost and most to come we've
7:26 pm
been presenting community meetings and going face to face with community owners and helping people understand what to do >> you may be wanting to know about the sf green but this will allow you to have is a loan for the property so if you have the property the loan will be summoned by the new owner and this is pay back for your property taxes and the low rates this is a fantastic option. >> i'm in favor of the program obviously we're going to have a earthquake this is from an investment stewardship. >> after a few minutes with folks even if you don't agree you understand the concept. >> we've talked about being able to do this now we're going
7:27 pm
to be forced to do this it's a good thing but to pay for it. >> it's not only protecting their property but every dollar is for mitigation it truly is protecting our investment overall the city. >> it's the right thing to do. you can look at the soft story building and theirs like the buildings that collapsed in the earthquake and your shufrtdz to see this >> people are getting caught to get this done and if people can find a place in our homes of shelter it will keep people in their homes. >> together we'll work out of
7:28 pm
getting out of 0 disaster and making the community bringing back to what we love. >> as a level of folks we've talked about we make recommendations to make everyone mitigated their soft story problems no other jurisdiction has tried to tackle this ordinance and we're set to have our program complete by 20/20. >> the quality of the people are here because of the leadership. >> it's a great conversation statewide how to do this and i can only stress this enough if we didn't have the community of the san franciscans that are
7:29 pm
concerned people, you know, talking about our financing is options and our engineering requirement if you altercated all our work it's consensus driven to provide options we don't have one path but one relative for people to get there. >> it's been an excellent consumption of the services i think i'm going to need if i go through this yeah, i'm very
7:30 pm
>> we are ready to begin. >> good morning, today is wednesday, november 19th, 2014. this is the regular meeting of the building inspection commission. i would like to remind everyone for please turn off all electronic devices the first item is roll call. >> president mccarthy. >> here. >> commissioner lee? >> here. >> commissioner mccray?