tv [untitled] December 7, 2014 12:30am-1:01am PST
12:30 am
letters this is the rear of the building existing commission surrender here at the site of the project that was intact at the design the last image was a 1917 edition 34re89 immediately after the original structure but not received the 1916 design that the original received it brings us to the proposed design the features are the same as the design including the staircase and exit the wall that previously ran along the wall was minute missed that's a trash enclosure and the original allow structure and far bottom right is exposed behind a
12:31 am
wall the substantial change is a stack place on the flat facade the height relates to the request of the immediately adjacent neighbor they have had reached an agreement with the project sponsor the vent lation will be beyond the roof of the building primarily looking at those unadorned facade to prevent creating a distraction on the 1916 part of the building finally with the roof as you can see in the plan you'll see a lot of additional equipment going it on the revolver this is on scale with 9 current equipment not visible from the public right-of-way and where the par fit is raised a few feet
12:32 am
up in the left hand corner and the stairs in the plan and the additional mechanic equipment i'm happy to answer any questions. >> commissioner wolfram. >> it was hard to tell from the roof plan how far the ducts off the wall the west wall from the roof plan that looks like they're coming away from the wall and turn at the roof level to the left and the conducts don't show on the lower level plan. >> that's correct so the dimensions are accurate on the roof plan and to be attached to the structure as closely as possible i've been told by the mechanic engineer federal and state this is the minimal size serving a kitchen but indeed the roof plan
12:33 am
is in scale they'll be attached to the flat and so their coming out flat and turn and go up is this it. >> correct. >> that's the square where it the angling up. >> and where's the architecture stroud. >> this is the commissioner approved it is i assume that is directly around the ventilation stacks i'll be open to comments one wide shroud you mean the shaft. >> this is the only one visible from the right-of-way. >> right. >> bow nothing it on the flat roof right it's just mechanical.
12:34 am
>> the par fit existing at the roof you could see the shroud hiding the vent shut up stack is my understanding commissioners any other questions we can do public comment and bring that back if you like any public comment on this item? seeing none, public comment is closed commissioner wolfram. >> my only comment about the mechanical ducts i think a shroud is a good idea or the whole thing built out of stucco the benefit it is in back it seem like you could have a bump out a stucco bump out and conceal it you'll see a bump in the building i definitely agree
12:35 am
it seems like they should be concealed it's not very nice to the neighborhood with the kitchen captive ducts you running outside of the building. >> this is some folks front entry. >> to be honest we'll not allow this in my street so honestly, i agree with commissioner wolfram i'll take it to the point of the metal screening it is the same thing i'd rather see that become a part of the building so a shaft going up. >> that is the way of a columns. >> maybe metal concrete but the concrete you know screwed on any kind of screening doesn't do it.
12:36 am
>> i think it should be integral with the building. >> yeah. that's a lot of duct. >> and those ducts have some kind of under age pieces not pretty. >> and back for the sponsors sack this is some people's front entry we wouldn't allow a duct facade to be covered it is a good solution. >> commissioners. >> yeah. i was interested in studying the edition this is on page 3 of the motion as part of the site permit the project sponsor shall provide and reveal on the east wall to denote the location of the historic doors what does that look like? was that in the site plan can you thrumming tell me.
12:37 am
>> within the interior that are a couple exterior doors that are no longer in operation. >> okay. >> so commemorate where that door was in the interior or have the project sponsor show they're a door. >> this is an architecture term i'm not familiar with is it a recessed part. >> it is an actual recess within the wall it basically shows where the frame is for the door. >> okay. >> quick question commissioners did you have a preference on whether it's a one shroud or two shrouds over the ducts since they're separated from one another and i think i'll be inclined to do one. >> the building is putting
12:38 am
dublths closer it together get on the roof and spread them. >> i think this would be simpler. >> right. >> i mean it is recessed back you'll have the - >> otherwise you're going to have on this one - >> one is weirder than the other one and two dimensions and the space left. >> it is uneven and won't look right of. >> right. >> okay. >> will you craft that one. >> i think that i would make a motion to approve with the condition that the commission would prefer one architecture rather than calling it a shroud but an architecture enclosure and it can be similar to the building elevation as possible. >> i second it.
12:39 am
>> commissioners then on that motion to approve with conditions to have an architecture shroud commissioner hyland or excuse me. commissioner johnck arrest commissioner johns commissioner matsuda commissioner wolfram president hasz so moved, commissioners, that motion passes unanimously 57 to zero and places you on item 8 the civic center landscaper to approve the finding of the inventory. >> good afternoon tim frye department staff at this point, we're going to ask you to continue this item the good news is the civil serves firmer has
12:40 am
forwarded to be completely as asked by the commission i have to connect with the consultant and fourth their timeline to get the revisions to us so i think at this point it will be appropriate to continue it to either your second hearing in february or your first hearing in march happy to come back with an update if you so wish before that time. >> so it makes it february 18th or march fourth 2014. >> did i provide us with a scope of the work that the consultants were going to do we advised but what so if the civic service commission approved that contract. >> the scope of work outline was to incorporate and to
12:41 am
basically remedy the outlying areas for the civic center and we've been working with president hasz and he's been working with us to update that work. >> no, this mr. haas. >> commissioner johns. >> i suggest we move this to the hearing in march and the reason is that this is a complex thing the consultant is not yet that deal has not been finalized but will be i'd like to be certain we've given enough time so we don't have to continue it again. >> i agree. >> commissioners we have consensus >> yeah. >> any public comment on this item?
12:42 am
nope closed public comment and if i could have a motion. >> i move to continue. >> to march the third. >> march fourth. >> march fourth, 2014. >> okay. >> thank you on that motion to continue this matter until march 4 commissioner hyland commissioner johnck commissioner johns commissioner matsuda commissioner wolfram and president hasz so moved, commissioners, that motion passes unanimously 6 to zero and with that, we'll adjourn
12:43 am
>> good morning. >> are you ready? >> okay. >> good morning, the meeting will now come to order. welcome to the regular meeting of the transportation authority finance committee, i'm cohen, share of the committee and to high left is tang and to my right, scott weiner, david chiu has officially resigned from the transportation authority finance committee. and will be moving on. and madam, clerk, the clerk is steve. sorry. >> and also, would i like to thank, charles our friend up at sfgovt tv for broadcasting this meeting, mr. clerk, could you please call item number 2 item
12:44 am
one one? >> roll call. >> cohen? >> present. >> commissioner farrell? >> absent. >> tang? >> present. >> commissioner weiner. >> present. >> we have a quor up. >> could you call the next item? >> consent calendar, 2 and 3 comprise the consent calendar, these are routine and not presenting but prepared to present if desired, any of them may be removed and considered separately. >> thank you very much. >> is there a staff presentation on items 2 and 3, no let's take public comment on item two and three. >> seeing that there is no members of the public that would like to comment on these two items, and this item is a roll call volt for item two and three. >> cohen. >> question. yes.
12:45 am
>> farrell. >> absent. >> tang. >> aye. >> weiner. >> aye. >> consent calendar passes. >> all right. thank you very much. please call the next item. >> item four, recommend acceptance of the audit report for the fiscal year ending june 30, 2014. this is a action item. >> we have the presentation. >> today we have the fiscal year, 13, 1 4, audit, we have our auditor is here to present the result and in addition to ad iting the financial statements also a single audit over the programs in the authority since we have received more than $500,000 of federal funds, i would turn to over to cindy she is a partner, and she is the auditor on the audit, thank you. >> welcome. >> thank you.
12:46 am
>> good morning. thank you for this opportunity to present the results of our audit. the scope of the transportation audit includes the financial statements of the transportation authority as a whole along with its four major programs, the sales tax, congestion management and the transportation fund for clean air and the vehicle registration fee and programs and the federal compliance audit of the federal award program, the results of the 2014, audit are found in two deliverables and the annual report f, found on page 30 of your packet and the report to the finance committee found on page 88 of your packet. the purpose of the audit is to obtain reasonable assurance that the financial statements are fairly stated and that the applicable framework of the audit includes generally
12:47 am
accepted accounting principals, auditing standards and prom gated by the gaap and accepted by the aicpa. >> and the gao. >> and a summary of the results of the audit is found on page 55 of the annual financial report or 86 of your packet in it we rendered an unmodified, and we did not have weaknesses over the financial reporting to report. and this is a favorable out come. >> and we performed a compliance audit on the transportation authority, federal expenditures since the authority had more than 500,000 of federal expenditures during this past year, the u.s.
12:48 am
department of transportation requires that we perform additional compliance tests work on the authority's management and control activities, and we also issued and did not have materialal weaknesses or any other findings over the compliance to report as well. >> >> the second report is the report to the finance committee and under the professional standards we are to provide, the oversight bodies with information on the following seven items as listed in the slight prepttation, and this is included in the report to the committee. as related to the aspects of the accounting practices the authority was required to implement the renewed accounting standards this past year and these new standards did not impact the authority
12:49 am
financial statement of the presentation, and the authority also changed the revenue recognition of the period from 120 to 90 days to conform with the city's change and the other communications are nothing out of the ordinary and we did not encounter any differents or disagreements with the management. >> and i would like to thank the authority staff for facilitating the audit process which started in june, and it earlier of this, this month. and it was a smooth as it can be, and given the authority was in the midst of a new system conversion project as well. and with that, i would like to turn this back over to ... >> thank you, no irregularities or any red flags or anything of concern. >> yeah, thank you. >> i just want to clarify a
12:50 am
little bit on a single audit, the federal audit, they took a look at the island ramp and bridge structure the e-fleet, car program, the integrated public, private and partnership and the san francisco value and pricing and regulation study, treasure island mowbility management program, and the congestion management agency planning and programming and the surface transportation program and all of this was funded by federal funds and the audits came back clean and i would like to just mention that it was a huge effort to share with the new implementation happening and i would like to give a heartfelt thank you to the staff and especially (inaudible) hew, who kelley (inaudible) and i mean that this year was one of those years that we had more work than normal and we were able to come out with the clean audit and implement the erp system on time too.
12:51 am
with the really good year for us. thank you, and with that, i am more than happy to answer any questions and so is miss pawn. >> colleagues are there any questions? >> seeing none, no questions at this time. >> thank you, let's take the public comment on this item? >> public comment is opened. seeing no comment, public comment is closed. >> could you call the next item. >> a roll call vote. >> yes. >> item number 4. >> cohen. >> aye. >> farrell. >> absent. >> taning? >> aye. >> weiner aye. >> the item passes. >> thank you, could you call the next item. >> introduction of new items. >> thank you. >> are there any supervisors or commissioner tang has a new item for introduction. >> thank you. so, today, i wanted to request that the transportation authority conduct a strategic analysis report and by way of background, what our office is looking and hoping to do in
12:52 am
partnership with the ta is really to examine some of the transportation needs and specifically, in connection to certain nodes that would help to better our out lying neighborhoods as well as the sunset district and others. >> and so we work with the community to put together the sunset district, blueprint and the road map for what we would like to see happen and of course, one of the biggest issues that we always face is the transportation, and the public transportation and so one of it is things that we know, but as well as through the ta's san francisco, transportation plan is that there really are a geographic disparities, but not just my district but supervisor cohen as well and a lot of the out lying neighborhoods and the idea is that we would like to explore the ways that we can better shuttle our residents through certain transit nodes and whether it be local such as through the west portal or a regional connection, such as to the bart and call train and so i am hoping to also address some of the emerging needs that
12:53 am
do exist as well, such as with the taxi industry or even the ride sharing industry and how we can be really proactive and thinking about how we manage some of those programs. and so, we of course, look forward to working with the ta in developing a scope for this strategic analysis, report. and hoping to receive a scope by december, and look forward to again, looking with our ta staff and our community and in developing this, with that, i submit. >> great. >> see if there is any members of the public that would like to speak? >> would you like to make a comment? >> chief deputy, thank you, and commissioners tang, just for the benefit of the committee and those folks watching, we do budget each year to do one to three strategic analysis report and they typically are on policy issue and topics where you are looking for a quick information to support a policy decision or a scoping to lead to the next step and the
12:54 am
procedure is once, the commissioner, requests this we will return with a scope that is subject to the approval by the board before you are authorized to begin the work and we will do that next week. >> just in two short weeks. >> thank you. >> let's go to public comment. >> public comment seeing none, public comment is closed. >> let's go to the next item. >> 6, public comment. >> general public comment is open. >> okay. general public comment is closed of >> is there anything else. >> there is item 7, adjournle. >> thank you, this meeting is officially adjourned.
58 Views
IN COLLECTIONS
SFGTV: San Francisco Government Television Television Archive Television Archive News Search ServiceUploaded by TV Archive on