particularly it's outside the envelope it is two ways it is not the expanded deck at roofline is out into the planted part permit holders were not transparent and after step of the way we tried to tell them we were concerned about their permits were exceeding scope and we very repoint out they've never fully disclosed the work and if the permit holders tried to understand their terms of variance they would have seen it violates the permit we want a new permit issued when the plans conform with the code thank you.
10:31 am
>> mr. cripple. >> how does that firewall effect our view. >> the one on the opposite side. >> from the other property line and well, they showed us the wall between our property actually, it's not a firewall and required by 3 owners they built that wall at that height but to answer our question we sat on the deck we see out over the cut out part of the wall and see their wall instead of green trees up on our master bedroom we say a tiny view of the bay a view the bay a green and giant wall if it is up to code we're
10:32 am
entirely okay with that. >> we can hear from the permit holder now. >> thank you frank again hopefully, the record is now clear from mr. perez comments there never was a separate deck small deck as they entire certainly when we purchased the property the 3 r report from the building inspection indicated the patterson edition was properly built we had inform reason to think audits what we are repairing and rebuilding was approved if 23407 as the
10:33 am
patterson son addition as we know that now the she - mrs. cripple said this small deck was demolished it has not been demolished we tried to point out part of the decking was removed from the die rot. >> and that exists and it is the shape and size it was in the drawing and please a perry showed it before the cripples bought their property nothing has changed and i don't see how it can be considered a variance issue if it was never built that way it was in the plans it if exist before the plans and not built no longer or in accordance
10:34 am
with the plans the balcony was never there i guess a couple of other comments they argue our proposed work is not fully permitted that was approved by the building inspection and the planning department also certainly the dbi inspectors will assure that both to us and he cripples the work is in compliance with the building code a comment they made previously now there never was an existing stairway to the ground never anything we panned pa planned to do i'm not sure where that came
10:35 am
from yes, we were issued an n o v and in behind site clearly the work was getting ahead was it was dry rot investigation was getting ahead of what was expressing said in the permit but it was being addressed thank you and we request the appeal be denied and the permit upheld. >> mr. duffy anything further. >> commissioners joe duffey dbi again i don't have too much to add one thing if this hadn't been appealed and we dealt with the complaints from the lady we
10:36 am
in all likelihood this permit would have been suspended we would have said hey your plans are not showing you properly what our doing i which is looking at the plans there's no existing sections to show where the angle window is not scared off this triggers something i imagine that is something even though it's small they'd consider is additional square feet so i think we'd stop them and say hey, get a proper set of plans and employ for your permit you have to go drove the process that would be fair to say looking at that is how we would probably deal with that we can
10:37 am
do that good work of mr. larkin on those types of cases the stair a way, way confusing it was a violation, however, the plans don't should a stairway there was stairway that was fine but it was on a notice of violation i noticed that i was confused a little bit about that. >> good evening corey t for planning a couple of quick notes and we didn't point out this out before but prior to the under oath variance an existing shallower deck but widower the proposal in the variance was to demolish it deck through the ground floor but no deck on the
10:38 am
south side with the conditions the variance the plans were approved with about consistent with the plans with the variance you can't simply choose after the variance not to demolish a portion of the 0 structure that was non-conforming and be it that by itself will trigger a new variance that will not be consistent or approved by the variance even though they didn't build the small balcony it was - the other thing i want to be clear that our position on o this project is in 0 no way a judgment on the current owners everything with the prior owner it appears that you know whatever work that was done or
10:39 am
not done in violation of the variance and the issued building permits before they bought the prompt and the work that was done was not done well, the issue of them going progressively from a repair to 0 proorment situation probably was a dry rot situation that wouldn't go away unfortunately you know bans the facts we have the project will require a new permit and variance i'm available for that other questions. >> what action will you take then. >> well, what we recommend here is the current permit is not adequate the permit that is before you should be denied and they need to file a new variance
10:40 am
and permit the exact scope of the variance depended on what the project sponsor wants to move forward it if they want to do a project to the scope of what is proposed on the permit they need to file a new variance request and have a new permit. >> they're not pressured on timing come back with another permit. >> if the board denies it. >> no, it will be changed. >> or they have a choice of conforming to the original variance which is entirely cyst situation but requires a new permit. >> right either way at this point, because of the repair project has essentially gone to a basement project of they build back what was the same variance they trigger the variance by
10:41 am
replacing it technically it is required. >> the variance and new permit application in my opinion. >> i think see. >> i believe the building inspection believes that also. >> so okay commissioners the matter is submitted. >> action and motion i think it's clear. >> unfortunately, the permit holders argument that so it was signed off but signed off based on the documents it didn't conform to the variance give him a change of scope that is allowed the condo map substantially does not necessarily provide any further entitlement beyond what is the
10:42 am
fact it was filed for that the representation itself so i think we have no choice but to revoke the permit. >> okay. you want to move. >> do i have a suggestion? commissioners, i would agree but is there a plan for the new permit and we'll add to it he needs to be able to close that off if in some manner >> yes. >> the one year bar in the status didn't prohibit someone from getting a new permits the reason for the permit is to correct. >> that would not bar them from being able to apply within the one year. >> what about protecting them
10:43 am
against the manual storm coming tonight. >> it probably we work closely with the board of appeals certainly with the cynthia 2k3w08d at the scene if someone needs to bmi up their knowledge we allow them to temporarily waterproof it. >> i want to make it clear can i unusually it's a day or two to close it up. >> but it needs to be in conjunction with our office. >> we need to meet with the contractor and clearly state what that entiles not finishing the project. >> misunderstood. >> so is that a motion commissioners and is the basis that the existing 0 permit doesn't conform.
10:44 am
>> mr. pacheco call the roll please. the motion from commissioner fung to deny this permit with the finding that this permit didn't conform to the existing variance. >> that's right. >> on that motion to deny this permit commissioner president lazarus commissioner honda is absent commissioner wilson thank you vote 3 to zero given the boards vacancy this permit a rerecognized with that finding there's no more business commissioner president lazarus. >> we're adjourned
10:46 am
10:47 am
personal and long connections to the building on 66 raymond this story of this building has been a rofks story of tragedy and of loss but today, we come to celebrate victory over one hundred years this building behind me has been in the community a tremendous and the that served generation many of the folks that participate in the community at it have you ever seen venue i want to acknowledge the long-standing community members thank you for being here and many of you know, we lost this exit to foreclosure we've been through many, many community meetings and many hours discussing the future of 56 raymond to today it is with great pleasure and honor i
10:48 am
announce the city of san francisco habitation acquired the ownership of this property 66 raymond (clapping) and what's most important this day is not about reclaiming a building but about reclaiming an important piece of the visitacion valley center community for the community this asset was lost a long time ago due to foreclosure but with the help of the mayor's office the help of my staff and, of course, the tremendous help of the community the members 3 stand behind me their advocacy we won this is symbolic because a neighborhood stood up and fought and we've delivered 2, 3, 4 tremendous interrelation mom it's occasion to the visitacion valley center neighborhood we're here to be here i'm proud to deliver back to the community 66
10:49 am
raymond the city's ownership means the residents will have a health place for activities to gather as a community the cities ownership of this community center of this building we'll have a place tour our seniors and visitacion valley center thank you to all the community members that have remained steadfast and the next person you'll here from is mayor ed lee he'll share with you his vision after the mayor maria sue between many meetings she and i have met to late out a specific strategy and services that happening happens at 66 raymond mr. mayor thank you for being here (clapping.) i think we want to make sure
10:50 am
many have translations let me say something in chinese okay. >> (speaking foreign language.) >> cowen - raymond all right. i just said to them that supervisor cohen just announced that the 66 raymond street has been gifted to san francisco government so that we can in turn use it according to what supervisor cohen has explained for all the community uses and the seniors here that are gathered are here know this is an important thing you saw them clap they've been for years wanting to make sure they've expanded the services limited at
10:51 am
50 raymond to now the other side of the courtyard filled with the capacity services of the city i know that supervisor cohen has think been here for quite some sometime and through her leadership that did owners of the building said we have to do this and make a difference we went through some times when we doesn't were not certain whether or not the owners of the building would cooperate now they have i serve as a back up to supervisor cohen and i said this wherever she said we have to do something and certainly the same thing with the board president president chiu we wanted to make sure the funds we at the time set aside with supervisor cohen's leadership those funds would be spent to
10:52 am
make sure that the buildings would be rehabbed and make sure that they would get a good level of rehab so that it could be converted to senior use a lot of champs but welcome everyone to visitacion valley this is a wonderful part of our as you can see xhooufd said the sun is shining on us we have good news and right here visitacion valley we were down here a few months ago opening up the supermarket and across the street you'll see 17 hundred brand new units of affordable housing because of the location here and because of the income that people make around here i know the developers right here is excited about this we support him and make sure this project gets down this community is on the move a lot of things happening in the south crossroad
10:53 am
of our city therefore this of 6 raymond is a good announcement and investment thank you to supervisor cohen for her leadership and quite franklin e frankly wouldn't be done without her tests her persistence as a team i mean team kind of like the team that is going to play tomorrow night and i want to say thank you to supervisor cohen we're happy to share this news with everybody who uses the center and wants more activities and more improvements we're going to be hearing a lot there's a lot of things to get done and thanks to her leadership with supervisor cohen we'll continue to get a done your next up maria sue for families it oversees many of the families at raymond.
10:54 am
>> it's a such a beautiful, beautiful day and appropriate we're celebrating if this with the sun and residents and community members i'm maria from the youth department i'm proud of the leadership with mayor ed lee and supervisor cohen and president chiu for truly bringing back this sister building of this true community interit has been is an anchor within our city and the visitacion valley center for well over 95 years and supervisor you said one hundred years this has been a place for residents this place is a place for parents to come to seek support services for their children to learn how to support their babies a as they develop e develop a place for youth for mentor and place for seniors for
10:55 am
nutritious meals for opportunity to congregate and socialize to bring meaning to their lives i'm proud to be standing here with the city community and our community balances partners to revitalize this center and bring that back to its full glory of what was was before i'm proud and committed as folks to bring the services back here to insure that our young people whether they're coming from school back into they're community there's a safe place to come to if they want that first opportunity for career development come here for the skills tests apartment that need support for after-school program and services they can come here and receive the support i'm really proud the leaderships once again and mayor
10:56 am
ed lee and supervisor cohen and president chiu and i look forward to working with them as well as our community based organizations and our community residents to make that as beautiful and vibrant as it should be thank you. (clapping.) the woman i'd like to introduce is my amy chung providing services to the executive director for the sales help for the elderly thank you
10:58 am
>> (speaking foreign language.) >> so just briefing i want to thank supervisor cohen and mayor ed lee and maria for helping us get this piece of our community center back when two years ago the seniors were running our center for over 20 years was asked to move to our invitation center a lot of the seniors wanted to program but that was under foreclosure thank you supervisor cohen for listening to our seniors and expressing their needs to have their programs here we're very happy to be partnering are mayor ed lee and supervisor cohen to provide the programs the seniors need and thank you very much it up for listening anticipate
10:59 am
protecting our seniors making sure they get a place they call their second home so thank you very much (clapping). >> in closing, i want to say this is the physical manifestation when everyone has a team effort again, thank you to the community partners and other community partners behind me thank you as the giants pulled together they can pull out a victory when everyone plays his position that's mayor lee's suggestion i didn't deliver it as well, so i'll end with this go visitacion valley center and go giants.