tv [untitled] December 25, 2014 8:00pm-8:31pm PST
8:00 pm
>> moved and seconded. >> on item 9, breed. >> aye. >> campos. >> aye. >> kim. >> aye. >> mar. >> aye. >> yee. >> aye. >> item passes. >> thank you. >> one more item. >> item 10, t-third phase three, concept study and this is informational. >> and we have mr. mason. >> and thank you, commissioners we will try to keep it brief. and this item just on page 67 of your packet. and this is the manager of our interagency team and acknowledge the excellent work by the transportation as well. and perry, and joshua swifty and our consultants. so as you know as the central subway comes near completing last spring, it grew to work on
8:01 pm
the extension to make use of the tunnels that are completed and possibly preserving the right-of-way along the corridor and the transportation of the board at the urging of the commissioner chiu and we are pleased to share you the results of it today, and i will turn it over to the alignment. >> thank you. >> and welcome, and my name is gardi and that is what we will see today and we can move on it quickly and the concept alignments, and what the columbus avenue and up the street and over on the beach street and the one way loop and so that we forced it in the three but there are three different alignments, and the next slide? >> okay. and out of those four corridors we looked to the scope of work at all subway and subway surface alignments and powell street had some more actual alignments there because we look at different ways to turn the vehicles around and the
8:02 pm
runway loop turns them around and services them and because we need to do the extra space and so we divide up the 14 and we found in the process as we were going through this, because of a suer line that was printed in the 80s, along (inaudible) to the alignment of that they were not fees able and we can determine that already at this time. the cross section here shows kind of the overlapped view of the grand from about 100 feet above, to i don't know, looking here, and 100 feet below and it shows that the consultant and you are building it deeper to build to the better ground and you can see what the stations actually in the 5060 feet down, and doable though. looking at this specifically and the liqifaction and the
8:03 pm
earthquake and 2100 and they both offer the challenge and initial review by the consultants was that these could be the testing and design and engineering and techniques that should be able to take care of that. travel lime estimates take away from the busy slide is subway twice ases fast, the surface, three to four minutes from china town, and to the immediate north beach station to a station at the end of the line at conrad square. travel time comparison, and the purple line and that is the route of 30 stockton and depending on cal train to the fisherman's wharf and we estimate that it will be 14 to 17 minutes in the same area. >> and sure. >> with that large improvement
8:04 pm
in the transit travel times this extension that attracts a lot of riders, and we estimate the trips on the line and that is 55 percent increase with the line, and but a quarter of those trips are new and so those are people taking autos or others means or not making the trips and remaining trips are folks coming from the over crowded lines to better balance out of system and improve the performance of the other lines up in that neighborhood. and serving out with the rider ship increase was the subway will be able to handle it and this shows that the peak element does not increase in the trips and that is due to the nature of the demand in these neighborhoods and you can see that no red or the upper red lines that is will be sufficient to support a capacity while the line is planning to run 2.5 minutes by 2030. as part of the study, to analyze the land uses and the development section of it, and
8:05 pm
so these are mature neighborhoods with only a few soft sites in the quarter mile and really none of any size within a quarter mile to north beach, and using this analysis, our strategic economics recommended the dropt value increases. and they found several tools to be used to obtain the bonds for the project but none are going to pay for it in full and also found that with the limited number of sites, and changing the designing height limits will increase the revenue. and you can see that these tools could contribute from $10 million to $200 million from 5 to 20 percent of a project. that brings us to the capitol cost. (inaudible) who did a feasible and constructionbility repaired and each of the concepts based on a national data base but adjusted for san francisco and
8:06 pm
these are not inflation adjusted. but these drivers of the cost of these, are the number of stations and the amount of underground verses surface construction and in the cost ranges from 400 million from the shortest route to the longest underground concept and you will also notice that they are twicing of the costs and but may notice that they are twice as fast, and so, a two way, i objectsingsing tension is estimated at about 500 million for a partial surface but about 900 million for a full underground option. and we will use that underground option as an example to see how it compares and i can see that it ranks firmly for the highest category, as defined by the fta and that is cost per trip. and so the project will be competitive to obtain federal mixed, and but there are many projects in san francisco.
8:07 pm
and so it must first find the place in the local priorities and the match for the funds could come from a variety of sources including those valued capture mechanisms or i mean that the local transportation measure, for example, prop k, extension, and the other contributions like proceeds from the joint development of a site above the station, and may return to paul to talk about the other issues. >> north beach which is a point on phase two construction and that is where the tunnels will extend to pull the machines out without having them come out in the middle of columbus avenue and we will just keep the machines going and fortunately the environmental process has been stretched as far as it could and that was not feasible and the machines have been taken out and they do have a lease on the site through may of 2015, before any activity can go forward with construction of anything on that particular location. and we also have a right of
8:08 pm
first refusal if they are willing to sell but we have not any indication that that will be happening. and so what this shows here is if a station were to be built here there is significant impacts to this neighborhood. and the cost to do a station initially was looked at along the other alternatives of 350 to 500 million dollars, the more expensive one will have less disruption but take longer. >> we want eded to do even though we are not going to do a recommendation and it was a simple process of 7 different categories if this probably better than average or average which will get a 0 or a plus or weak around that issue it was given a mean us and these are not weighted in any manner they are all equal, which will change if this were the valuation. and the out come, was that the
8:09 pm
two subway on the shortest going up columbus and scored the highest and this is reasonably well, and now, all of the surface alternatives scored less and probably the reason behind that was that we are looking at issues of investment and service reliability and once it is underground and operational, and it should really not have any problems with it and, also, a disruption to the communities during the construction and operation will be less. we can go over the last slide actually. these are the next steps, this project was the blue arrow going out and it is feeding information into a transportation plan up date which is managed by the group to feed into something that mta is working on to call a capacity and which is looking at short and long term investments including upgrading
8:10 pm
and making changes to the existing system as well as capitol investments for future con jeks and that study, is feeding into the mtc or the core capacity, for san francisco. and which is due out, later in 2015, at the beginning of 2016. >> thank you, commissioners that concludes our presentation and we are happy to answer any questions. >> colleagues any questions? >> could i just ask about that columbus avenue site that he kind of went through quickly, that was going to the theater site and it looks like the owner is preparing to build 19 units of housing but the mta have the first right of refusal, if they decide to sell, could you talk about how that impacts this proposal? >> briefly, having a large open site anywhere near a major construction site, and since north beach is a dense
8:11 pm
neighborhood, if either, the met and which is actually less disruptive is used you will have a place to stage, somewhere in the area and having that piece of property, when someone makes the staging east and her might actually have the consultants group that makes you having a less amount of grout on the columbus and powell streets to build the actual infrastructure underground and not having another location in that area that is opened to allowing the staging will cause a disruption and will have more impact on cost. >> and the project over all? >> you can compare this to the emphasis between the china town construction site today verses the union square, construction site today, and china town is mostly off street and the road remains open, where the union street requires the road to be closed for a extensive period of time. >> and i just thank you for the thoroughness of the study, and i will have to look at the cost benefit and it seems like it
8:12 pm
is providing benefits but what strikes me is that a half billion to 1.4 billion price tag and although there is sources of funding that you have identified, but i have questions about how it impacts the other priorities for the city as well. but thank you. >> and that is one of the next steps is looking at this in the context of san francisco's other priority and it we will be happy to keep the board informed of all of the developments. >> so i see no questions for the colleagues and open it up for public comment, we have one card, and anyone else from the public come forward to speak. >> good morning, commissioners my name is bruce agget and i am a member of the central subway group, and sf next stop.org and the board member and transportation met in the neighborhood association. on my comments today are endorsed by both groups. first, we want to thank property ject team from the mta
8:13 pm
cta and planning department. the extension provides a complete extension of neighborhoods on the eastern side of the city from visitation valley to the fisherman's wharf and the access of prospective job applicants to jobs. the hotels room to the center to provide the capacity to meet the demand and ultimately reduces traffic con jeks and improving the pedestrian, and bike safety to transition into a more sustain able livable city. we support the next steps outlined to incorporate the datings and findings in the
8:14 pm
various places mixed in the presentation and last, berecommend that the city may be planning or the real estate department investigate the opportunity to obtain the rights or the potential for the future locations for the samples that we just mentioned. and this is important, as the opportunities potentially exists today, which can minimize the future neighborhood disruption at the time of the construction thanks so much. >> thank you. for your support of transportation throughout the city as well. any other comments? >> thank you, and very briefly, i have yours and that could not be quite as eloquent and the only thing that i would like to take to your attention and the loop and from my experience it is a safety issue, because you have got the single down in the west in the central subway, you have two bowls and so if anything happens, you head to one of the cross passages and you head for the other tunnel and you exit. and so, as long as there is a single bowl, you should be, and you should not be studying that any further. >> thank you. >> next speaker?
8:15 pm
>> i had no idea this was going to be on the agenda, but it just shows the support from the neighborhoods, and the people at large, that take the subway system, that are in support of the expanding this t-line and fisherman's wharf and i hope that the commissioners will take the next step from this report and move it forward. thank you. >> thank you, anyone else, like to speak for the public? >> public comment is closed. >> thank you, for this great informational item >> next item? >> 11, introduction of new items. >> so colleagues any items? >> public comment, anyone from the public that would like to speak. >> mta, just to clarify,
8:16 pm
something that i said earlier, we are planning for a race track --. >> that is what i thought. >> okay. >> sorry. >> thank you. >> any other comments? >> public comment is closed. >> next item? >> item 12, public comment. >> we have chris wall. >> i just wanted to change the subjects a little bit. and commend commissioner yee and commissioner campos and the voters of san francisco for passing prop a&b and senior and disability people still are not riding muni for free. the aoe lks leks is over and we need to get moving on this and i know that the mta has a meet ng january that they are going to talk about it. but with he need to move this forward. seniors and disabled people need to ride muni for free.
8:17 pm
and the voters, passed it with the mta wanted and put this on we are still suffering and the city is very expensive and thank you. >> thank you. >> any other comments? >> public comment is closed. >> next item. >> item 13, adjournment. >> meeting adjourned. >> here we are at the embarcadero. we are standing at one of locations for the street artists. can you tell me about this
8:18 pm
particular location, the program? >> this location is very significant. this was the very first and only location granted by the board of supervisors for the street artist when the program began in 1972. how does a person become a street artist? there are two major tenants. you must make the work yourself and you must sell the work yourself. a street artist, the license, then submitting the work to a committee of artists. this committee actually watches them make the work in front of them so that we can verify that it is all their own work. >> what happened during the holiday to make this an exciting location? >> this would be a magic time of year. you would probably see this
8:19 pm
place is jammed with street artists. as the no, there is a lottery held at 6 in the morning. that is how sought after the spaces are. you might get as many as 150 street artists to show up for 50 spaces. >> what other areas can a licensed street artist go to? >> they can go to the fisherman's wharf area. they can go in and around union square. we have space is now up in the castro, in fact. >> how many are there? >> we have about 420. >> are they here all year round? >> out of the 420, i know 150 to sell all year round. i mean like five-seven days a week. >> are they making their living of of this? >> this is their sole source of income for many.
8:20 pm
>> how long have you been with this program. how much has it changed? >> i have been with the program since it began 37 and a half years ago but i have seen changes in the trend. fashion comes and goes. >> i think that you can still find plenty of titis perhaps. >> this is because the 60's is retro for a lot of people. i have seen that come back, yes. >> people still think of this city as the birth of that movement. great, thank you for talking about the background of the program. i'm excited to go shopping. >> i would like you to meet two street artists. this is linda and jeremy.
8:21 pm
>> night said to me to print them -- nice to meet you. >> can you talk to me about a variety of products that use cell? >> we have these lovely constructed platters. we make these wonderful powder bowls. they can have a lot of color. >> york also using your license. -- you are also using your license. >> this means that i can register with the city. this makes sure that our family participated in making all of these. >> this comes by licensed artists. the person selling it is the
8:22 pm
person that made it. there is nothing better than the people that made it. >> i would like you to meet michael johnson. he has been in the program for over 8 years. >> nice to me you. what inspired your photography? >> i am inspired everything that i see. the greatest thing about being a photographer is being able to show other people what i see. i have mostly worked in cuba and work that i shot here in san francisco. >> what is it about being a street artist that you particularly like? >> i liked it to the first day that i did it. i like talking to mentum people. talking about art or anything that comes to our minds.
8:23 pm
there is more visibility than i would see in any store front. this would cost us relatively very little. >> i am so happy to meet you. i wish you all of the best. >> you are the wonderful artist that makes these color coding. >> nice to me to. >> i have been a street artist since 1976. >> how did you decide to be a street artist? >> i was working on union square. on lunch hours, i would be there visiting the artist. it was interesting, exciting, and i have a creative streak in me. it ranges from t-shirts, jackets, hats. what is the day of the life of a
8:24 pm
street artist? >> they have their 2536 in the morning. by the end of the day, the last people to pack the vehicle probably get on their own at 7:30 at night. >> nice to me to condemn the -- nice to meet you. >> it was a pleasure to share this with you. i hope that the bay area will descend upon the plaza and go through these arts and crafts and by some holiday gifts. >> that would be amazing. thank you so much for the hard work that you do.
8:25 pm
>> hi, my name is jamie hooper. in this episode, we are featuring the romantic park locations in your very own backyard. this is your chance to find your heart in san francisco with someone special. our first look out is here at buena vista park, a favorite with couples and dog lovers. it is as old as its neighbor and both have a significant forest, a refreshing retreat from urban
8:26 pm
life. the pass that meander we do under a canopy of 0, redwood, pine, and eucalyptus. chill out and this environment and you might see butterflies and dandelions. blue jays fly between the eucalyptus. it is ada accessible. public transit is plentiful. six, 24, or 71 bus. we have conquered the steps, we walked the dogs, and we have enjoyed a beautiful view the park has to offer. this is the place to take someone special and enjoyed a beautiful look out. " come to corona heights, located in the heart of this district. it offers a spectacular view of the downtown skyline, the bay
8:27 pm
bridge, and the east bay. the park is one of the best kept secrets. unlike twin peaks, it is hardly ever crowded. on any given day, you will run into a few locals. hop on a 37 bus to get there with that any parking worries. locals can bring their dogs to run with other dogs. there is also grass for small dogs. >> it is a great place. it is a wonderful place for the city to provide these kind of parks. the dog owners appreciate it. >> take time to notice the wildflowers on the grassland. and keep your head on the lookout for hawks and other bird life. take your camera and be prepared to review the city in a way you will not forget. it is prominent with beautiful formations that are perfect to watch the sunrise from the east over the bay.
8:28 pm
this is another one of our great look out. we are at mount davidson. it has the highest point of elevation in san francisco, 928 feet. this is the place for you to bring someone special. enjoy all of the pathways, trails, and greenery that surrounds you. it provides a peaceful oasis of public open space and great hiking trails. the spectacular view offers a perfect place to watch the sunrise, or, sunset, with someone you love. >> it is a good place to get away from the hectic life of the city. get some fresh air. the view is fantastic. >> wear sturdy shoes to conquer the trail, you have the feeling
8:29 pm
of being in a rain forest. mount davidson is also a great place to escape the noise and the apostle of the city with your partner. -- bustle of the city with your partner. it is quite a hike to the top at mount davidson but the view is worth every step. this is the place to bring that someone special. for more information about reserving one of these romantic locations, or any other location, 831-5500. this number is best for special ovens, weddings, picnics, and the county for building. for any athletic field and neighborhood parks, call 831- 5510. you can also write us at permits and reservations.
8:30 pm
or walking in and say hello at old log cabin, golden gate park. and of course you can find more information at sfrecpark.org. >> finance committee, i'm commissioner cohen, the chair of the committee. to high left is tang, and to my right, wiener and farrell. i would like to think, charles and jesse for their help in presenting this committee hearing. the clerk of the committee is steve staymous. and mr. clerk, call item number 2. >> item 1 roll
58 Views
IN COLLECTIONS
SFGTV: San Francisco Government Television Television Archive Television Archive News Search ServiceUploaded by TV Archive on