11:00 am
repair plummet program i agree that was the best time we talked about that a lot and now that plaza heavy workload on our staff but as we work closely and insure your relationship is helpful i want to make sure we have that same relationship moving forward with the tunnel that's a high priority i see this relationship is really bend all the constituents in making sure the product is come out with all we want so in the mountain tunnel and on our 10 year vip and the prudent maintenance of all the facilities we want to work with you and although presumably mountain tunnel is smaller must costinger than wisconsin up it
11:01 am
is urgent one the things about the project the opportunity to work on it is very narrow and limited to only several weeks possibly 2 months in the winter when did tunnel can be shut down so every month in which a detail occurs increases the risk of the tunnel collapse and the risk to the consumers so i'm encouraged by the design work i know you've been work around the clock to make decisions and recommend a long term solution now is the accident for a comprehensive plan the wissop has proven time after time such a plan in our cpa as well as your type of plan with this magnitude things can change that makes we think so
11:02 am
that's where we're at i respectfully request you ask the plan to be presented to you by may first that concludes any remarks i'll be happy to answer any questions. >> commissioners questions. >> none for you you've been very clear (laughter). >> that's correct i'm going to turn it over to mr. kelly. >> so as you probably know we've been talking about the mountain tunnel for awhile and been in conversation with bosco and working on a schedule there are so many options so we pretty much have a schedule but there are some things we're accounting the details so we can come to the next commission meeting and present the status with a schedule because we pretty much have a schedule we just are
11:03 am
reviewing it and there's so many other options so at the next commission meeting you'll have a line item to go over the schedule and what are some of the options that we're still looking at and i think where we are now we have trying to deal with the access of the tunnel and i think we're leaning towards trying to patch the old tunnel if we were to do a timeline a bypass it would take 8 years to do that you have to go through the environmental and the time to constrict is in the meantime you're at the risk of having it so we need to do some type of repairs we're going to present wherewith he wish next week and work with nicole she's
11:04 am
been asking for schedule inform a while we'll make sure she gets an opportunity to look at it before we present at the next meeting and that's good i don't think we've ever really look at patching we've never addressed that so i think that will be - >> yeah. one of the things we had we had the tick citizens advisory committee the patching is one of the options as far as - i can't ask you that darn it (laughter). >> i can ask steve. >> can we give him a different name. >> i'll defer to norway reign to tell me if i'm speaking out of turn there was a study that looked at a complete replacement
11:05 am
of bypass section and patching we did as nicole mentioned brought on a group of experts they focused on the poaching as a viable low-cost option and generated a report unfortunately, the report they generated which doesn't use the same absorptions of the initial report what we've been gho going through a process of balancing the recommendations using the same assumptions but most critical of which the new studies assuming you have the environmental schedule the environment is 3 years so is something like that your toishl taking 3 years off the schedule so we're going through that process so when it comes you, you can make a policy decision as which way to go. >> i think when i read the
11:06 am
exceptional engineering report the first time it was talking about patching patching is not like old things on the wall but the sections of the tunnel so it's not a complete redo but a piece of work. >> the work has to happy from the inside out. >> right. >> so we may want to work on another word. >> is there a middle patch you patch the sparkle the most critical talented portions while you're doing our environmental bypass. >> that's the goal of january as mentioned we're very small windows we can close that tunnel down and we just went through an inspection of the coast range tunnel we accomplished within
11:07 am
that timeline with the closed range tunnel based on that successful inspection i directed staff to move forward with a inspection of the mountain tunnel with the staff the goal would be to do that inspection and actually get a real number of what is it the interior damage we're working on the loose report as i said, the incredible part i've initiate and the environmental work it relevant whether or not you're going to do the material repair or the bypass we're not waiting resources by the patching so then we'll have a sense of what the potential damage is that will give a sense of the risk of failure and the real schedule
11:08 am
for repair. >> and the costs. >> i've given copies of my statement to dona. >> thank you very much. >> mr. vice president can we do a time check. >> i was going to hear the consent calendar and take a break would you like to take a break now. >> it's not a motivator of a break i turn into a pumpkin of 4:30 we have a lot of work to do i'm trying to figure out how to do that. >> how do we manage that. >> well, we do have a power point pay attention on pour plan if you choose to maybe move it off to the next meeting i think
11:09 am
a that's okay. >> how long is that likely to take. >> barbara you practice on our speed. >> (inaudible) arrest depending on the questions. >> we're going to pause. >> i'm sorry. >> the next session will have the power? if it's going to take 24 minutes >> we want you fresh because a lot of information to - >> actually, that's probably a low estimate. >> about 45 minutes. >> yeah. >> so let's do this let's take a 10 minute break right now. >> sorry. >> oh i thought i asked for that. >> $10 $10, $10 i'm collecting.
11:10 am
>> someone is going to be rich. >> do i have any public comment? >> ifblg brooks i'm with the i run the our city san francisco and the sustainability chair for the san francisco party on the water committee of the san francisco chapter of sierra club i'm not speaking officially, however, open the sierra club simply that is off-the-cuff we e it takes along for us to make speaking, however, i was at the water committee meeting last week where we had a long discussion about the drought and the regional water system and what we're being asked to do around the drought i want to put-down forwarding the concept that the people working on the environmental communities are facing basically someone came to our meeting and said to us the
11:11 am
smelt and the salmon are in danger of going extinct if i folks don't crack down on our water reviews and need to get our people to do that i agree we should use the drought and bosco to use the drought for its customers brown about we should say to our urban computers and use this moment look we need to save a lot more water we as agencies need to do a lot more we've only touched the tip of the eyes beggar on recycle so, yes we need to say that to all our customers whether in urban assistance but it is agriculture 40 percent of use in california we had not mentioned agriculture
11:12 am
what about agriculture and that person said they're not allowed to draw surface water they're drawing ground water we correctly appointment to the person look we could use that ground water in the emergency to save the smelt and slam and we said do big agree have significant restrictions on the way they use water the answer was no i'll calling on puc and bosco to pound the pulpit that the impunity of water use is no longer acceptable and big agreeing needs not to be raising beef and other things to not
11:13 am
constantly going to our urban customers saying you and your personal use are not only the only problem as agriculture we need the agencies to start saying that loud and clear thanks thank you thank you, mr. brooksworks. >> the march 24th meeting of sfruksz sfruks is now back in session we're going to deal with item 11 that is consent calendar item 11 is the consent calendar consent agenda are considered by the board to be routine and will be enacted by one resolution in
11:14 am
the form or forms listed below. if discussion is desired, that item will be removed from the consent agenda and will be considered separately. 11 a approve the specifications and with regard contract in the amount of one million dollars plus to the scared construction and b the modification program for the counteracting for the duration by one hundred and 50 consecutive calendar day and c readvertise the contract. >> is there any requests to remove any item from the consent calendar. >> i move the total. >> second. >> okay. any requests from the
11:15 am
public? seeing none, i'll call for the question all in favor, say i. >> i. >> opposed? the motion carries. >> what did i do wrong. >> i already asked for. $20 (laughter) >> oh, dear. >> okay moving on to the next item. >> 12 for the updating of the policies and procedures. >> in the time limit i'll move for approval it changes around the interests that conform with the major changes. >> all right. >> second. >> yeah. i was fascinated by the green bond. >> we'll do the power issuance
11:16 am
in may we got approval on december 9th and come back on april 28th to give you an update of the contribution we'll talk about the green box we'll only doing inform the facilities. >> do i have any public comment. >> not being called green bond they're really power bonds. >> green is the designation of power bonds. >> is that on designation. >> a term that is being verified internationally more so than in the united states the municipal bond issuers like ourselves have using the bonds that coyote and- >> all in favor, say i. opposed? the motion carries.
11:17 am
>> thank you. >> next item, please. >> item 13 approve the amendment increasing the agreement by had millions in an extension of 4 years. >> good afternoon, commissioners this item allows us to continue some important work many performing on behalf of airport contract supports the power enterprises green mission building program the program provides the design and construction services to the airport and other municipal customers the customers pay the puc for the serviced we're receiving the airport effort that underway to terminal one experienced some scope changes with the u.s. green council misdemeanor their requirements to include a building enclosure
11:18 am
xhishgs he element so we through the amendment to the contract providing the airport with the capacity to complete the terminal one redevelopment captivity about u.s. green building council requirement that original contract was approved by the civil service commission for $9.07 year duration extension of $4.02 years is under the previously authorized 50 percent with that i hope you support this. >> again any questions we have a motion. >> so moved. >> second. >> any public comment on this item. >> (laughter). >> all in favor, say i. >> i. >> opposed? the motion carries.
11:19 am
>> okay next item 14 please. item 14 to the all the time increasing the amendment by one hundred and 50 thousand with a time extension of 3 years. >> good afternoon michael deputy general manager a crack with spur from the ocean beach we want to continue to have spur if a role to sustain us in casing that plan for the record to fruition i'll be happy to answer any questions. >> questions? comments >> i'd like to move the item. >> second. >> public comment on this item? all in favor, say i. >> i. >> opposed? the motion carries. >> thank you next item oh, next item are power business plan workshop is going to be postponed
11:20 am
we have to discuss. >> in the interest of time in that we want to cover a lot of important topics we'll reschedule the workshop when i'm present so we'll work on that and it will give us more time to fine-tune the presentation. >> there was a suggestion that we do the whole workshop together at another date and had have that a workshop session. >> we can definitely do that. >> well, we'll talk about that all right. could you please read the items for closed session and item 18 public appointment hiring arrest position to be filled it is assist general manager for the public utilities commission and item 19 for the
11:21 am
gas and electrical company vs. the city and county of san francisco and versus gas and electrical and city and county of san francisco 22 pacific gas and trek vs. the city and county of san francisco 23 exciting rehabilitation for the city and county of san francisco versus pacific gas and electric 24th pacific and gas and electrical and 25 existing rehabilitation for pacific gas and electrical and 28th existing litigation for pacific gas and electrical 26 will not be heard any public comment on closed session. >> mia any motion to assert.
11:22 am
11:23 am
11:24 am
director heinecke is anticipated commissioner rosales please be advised the director will not be here we have quorum so item 3 commissioner, back to you and may be acted upon by a single roll call vote of the commission. there will be no separate discussion of these items cell phones cause microphone interference so the board respectfully asked they be turned off and for people standing because of the fire codes people need to find a chair here in the room or go to the overflow room in room 408 so if we could fill in the empty seats approval for the minutes of the march 17.
11:25 am
>> motion to approve. >> second. >> all in favor, say i. opposed? the i's have it. >> item 5 directors please be advised no closed session at the end of today is agenda item 6 unfinished. >> excuse me. ladies and gentlemen, please okay. go ahead. >> item 6 introduction of new business by board members. >> approved. >> thank you just hearing from the disability community a few others around the communities have advised concerns about the private counterpart shuttles on charge i do not and thank you's some movement based name those contribute to people getting around town, however there are
11:26 am
concerns about the lack of accessibility for people in wheelchairs and guide dogs perhaps get a report on what necessary deal with mta at all whether they use our stops to comply with concern laws would be really good for us to know. >> director reiskin can you come back with a report. >> thank you, director. >> thank you. >> any other new business. >> i wanted to bring up the unfortunate cable car accident one of our operators was hit by a car that was illegal passing a cable car i know that safety in vision zero extended not only to the citizens again itself employees cable car that area is treacherous and people going places in their private
11:27 am
automobiles is there anything to protect our cable door operators better we frequently have crashes between cars and cable cars maybe time to make the streets cable car only. >> i was going to do give you an updated during my report. >> thank you. >> i appreciate the comment. >> any other new business members. >> i wanted to see. >> next item. >> okay. and just again members of the public who are standing because of the for codes you need to find a seat or overflow room in 408 go to the overflow room or find a chair now. >> item 7 director's report. >> ed reiskin. >> good afternoon members of the public and board and staff since you've mentioned i'll start with the issue of the
11:28 am
collision that happened excuse me. yesterday morning i say collision we're trying to eliminate the word accident because they're all preventable we had a cable car who was struck about tonguing in the morning on powell street this is around washington street a cable car was stopped he was getting out to throw a switch which is what they need to do and struck as the vice chair said by a private car a tourist car and as i understand a gentleman with too young kids mr. montoya way was pretty seriously injured request broken legs and ribs and
11:29 am
he's in intensive care but will be for the rest of the week there first of all, our thoughts are with him and his family and we couldn't have done it without you to support him but we're all a part of and can, victim to the safety of our streets what we're just as a sunlight to the the vice chair comments we're conducting briefing and looking at the vigilant around traffic i'm sure you're aware of the cable cars both our employees and patrons have to interact with the traffic with the safety and positive
11:30 am
additionally we've tafgd our traffic engineering folks to evaluate the signage and operation of the lights anything in their physical conditions particularly in that powell street whether it's a place every commuter of a vehicle is getting off the vehicle to go into the street to make the switch move so we're obviously taking this very seriously as we do all serious collisions in the city and just wanted to ask you to join me in wishing mr. montoya and the family as he recoveries he's been with the cable car with 18 years and speedy recovery and we will look to the vice chairs comment to other potential areas of concern throughout the cable car system as well so next