tv Government Access Programming SFGTV November 11, 2018 7:00am-8:01am PST
7:00 am
>> you are a mindreader. >> ok. i don't know why it is listed under that section but that is correct. we would be striking section six lines 11-25 on page 236. >> say that one more time? >> section six what? what did you say? >> 11-25. i apologize. we have so many different versions here. >> that is what i have.
7:01 am
>> there are a lot of versions with different edits on the website. but i believe what the amendment was to strike section six in its entirety. and that section is on page 237 lines six through 20. >> it is on page 236. >> you allergic -- originally said section six, right? on my document it is 11325. >> the document you have printed out in front of you may include amendments that were circulated today which is why it is off. it is basically section six. the unquantified section at the end of the ordinance. in the public late notice document on 237.
7:02 am
>> you made a motion to strike section -- section six. page 236 or page 237. 237 on the public document. >> do we need a roll call or can we do that without objection? we will do that without objection. >> through the chair, can i ask another question? on the points with the flower mart, i wanted to hear what you had to say one more time. >> we need to continue discussions with all of the stakeholders on this amendment. i have made a commitment to kilroy to come to some kind of resolution by november 13th to the full board. i am not making an amendment to strike this today. >> i heard that. i wanted to hear the other part about the conversation.
7:03 am
it seems pretty significant. >> we still haven't continued the discussion with all of the stakeholders. >> ok. >> ok. at this time, does the committee have any suggestions on how you want to move forward? >> i would like to make a motion to move this far with positive recommendation to the full board >> ok. can i recommend we do it without recommendation just for a couple of outstanding items? >> that is totally fine. i will change my motion to move this forward and got recommendation to the full board >> ok. do we need to do a roll call vote? we will do that without objection. ok. are there any other items before us today? >> for clarity that was item seven through 11? >> yes.
7:05 am
>> when i open up the paper every day i'm just amazed at how many different environmental issues keep popping up. when i think about the planet i want to leave for my children and other generation, i think of what contribution i can make on a personal level to the environment. ♪ clean power sf is san francisco's key way of fighting climate change by renewable energy and offering it to san
7:06 am
francisco customers. i'm from the san francisco public utilities commission. the program came about with state wide legislation in 2002 to enable people to take more control over supplies. i first heard of the program when the organization was advocating to launch clean power sf. what i'm most excited about, it's going to bring 100% renewable energy to my home and reinvest into renewable energy infrastructure and jobs. i had gone to a lot of street fairs and heard from the staff at the san francisco public utilities commission to sign up for clean power sf even before it launched. >> we learned about clean power sf because our sustainability team is always looking for clean
7:07 am
operations. linkedin is the largest online network. there are about 530 million members using our site. in this san francisco office there's about 1400 employees working in roughly 400,000 square feet. >> after signing up for the program we heard about the san francisco program and learned they had commercial rates and signed up for that. i'm the co-owner of the new wheel electric bike shop. we opened this store in 2012 and the new wheel sells and services electric bikes. 11 people work here in san francisco and our store is about 2,000 square feet. electric bikes are fantastic for transportation in the city, they're clean and green and you get places faster than any other form of transportation. it amplifies the power, it doesn't replace it.
7:08 am
it makes it easier to get places by bicycle and it's so enjoyable and environmentally friendly way to go and more convenient in san francisco. >> clean power sf requires two products, green, 40% renewable and competitively priced with pg and e. for those who want to fight climate change more, 100% renewable at $0.02 per kilawatt. >> i decided to go with the super greens, after finding it only to cost about $5 more a month to have super green, that's a no-brainer, i can do that. >> we were pleased that clean power sf offers the super green 100% for commercial entities
7:09 am
like ours and residents for the city of san francisco. we were pleased with the package of services for linkedin and now encouraging our employees who have a residence in san francisco to sign on as well. >> clean power sf buys its power from renewable plants that feed the energy directly into the grid. >> there's a commitment to sustainability throughout the entire organization and this clean power opportunity reflects that. >> one of the wind farms we use is the shilo wind farm and that is large enough to be able to provide energy for up to 200,000 homes. >> our mission is sustainability, even though our bikes are minimal energy use, it still matters where the energy comes from and part of our mission in sustainability is how
7:10 am
we run everything -- run our business. having the lights come on with clean energy is very important. >> the sunset reservoir has solar panels that take up about four city blocks covering the reservoir and the solar power generates energy for city resources and clean power sf for residents participating in the program. >> it was easy to sign up for the program, i went online to cleanpowersf.org and i started getting pieces in the mail letting me know i was going to be switched over and it just happened. when i pay my bill, i still go to pg and e and i don't see any difference between now and a year ago. >> sign up online, just have your account number ready and it takes about two minutes and there's nothing to install. no lines are getting connected to your home.
7:11 am
all the power goes through the existed power grid. >> we haven't had any problems with the switch over to clean power. >> it's super easy to sign up. our book keeper signed up online, it took about 15 minutes. nothing changed but now we have cleaner energy. >> we see clean power sf as a key strategy to meet renewable energy goal, we have a goal of 50% renewable energy by 2020. currently we have enrolled about 86,000 customers across the city. about 20% of what we hope to serve in the future and in the next two years we'll offer service to all san francisco electricity customers. >> an easy way to align your environmental responsibilities and goals around climate change and it's so easy that it's hard to not want to do it and it doesn't really add anything to the bill. >> joining clean power sf is one
7:12 am
of the easiest ways to fight climate change, receiving cleaner energy at low and stable rates, you're helping to support a not for profit that helps influence the energy grid and produce more production. >> i would encourage any business to seriously convert to the clean sf service. it's good for environment, business and the community. >> you can sign up online our call and the great thing is, you'll have the peace of mind that you're doing your part in your household to help the environment. ♪ ♪ ♪
7:13 am
- working for the city and county of san francisco will immerse you in a vibrant and dynamic city that's on the forefront of economic growth, the arts, and social change. our city has always been on the edge of progress and innovation. after all, we're at the meeting of land and sea. - our city is famous for its iconic scenery, historic designs, and world-class style. it's the birthplace of blue jeans, and where "the rock" holds court over the largest natural harbor on the west coast. - our 28,000 city and county employees play an important role in making san francisco what it is today. - we provide residents and visitors with a wide array of services, such as improving city streets and parks, keeping communities safe, and driving buses and cable cars. - our employees enjoy competitive salaries, as well as generous benefits programs.
7:14 am
7:15 am
ihenacho inasmu i will call to order the san francisco transbay joint powers authority meeting for today, november 8, 2018. can we call the roll. >>clerk: all right. and prior to calling roll, i'll note for the record that michael hursh is joining us as a member of the public, and on behalf of supervisor kim, katey tang. with that -- [roll call] >>clerk: as well, mr. chairman, you do have a quorum. go ahead and call your next item? >> yes, please. >> >>clerk: item three is communications. i'm not aware of any.
7:16 am
seeing none, directors, new and oral business. none. item five, executive director's report. >> good morning, directors, i will begin my update by providing you with the progress that we're making toward the reopening of the salesforce transit center. i would like to assure you and the public that we are working swiftly to determine a cause and reopen the facility, but we are balancing that with our responsibility to conduct a thorough investigation and fully cooperate with independent risk review and over sight provided by the metropolitan transportation commission. we are excited to welcome the public back to the transit center and the park. as you know, the first step toward reopening is to install a temporary shoring system, and we did so at both fremont street and first street locations.
7:17 am
we reopened fremont street on sunday, october 14, after the shoring was installed, and we were able to install the shoring on ninth street during night to minute muse public impact. with the shoring system in place, we were able to take samples of the beams in question on fremont street and smaller samples, as well, from the beams in question on first street. sample locations and findings were proposed by the tjpa and the contractor and accepted by our independent review panel. the samples were then shipped to l.p.i. laboratory in new york. the testing facility agreed upon by all parties, including the peer review panel. testing is underway to determine the cause of the fissures. we expect the results later this
7:18 am
month to tell us the findings and determine a repair. after, we will did he right lane open a schedule for implementing the repair and opening the facility. i assure you, we will work as quickly as we can, but we must ensure a trusting and thorough investigation to win back the trust of the public at large. i would like to thank the peer review panel members for providing us with over sight, expertise, valuable input and for their expeditious reviews. later in the agenda, the tgpa construction manager will provide more construction details as part of the update on the transit center closure. moving to phase two in the downtown extension, we received the final comments from the federal transit administration
7:19 am
for the supplemental environmental documents on friday of last week. we have since discussed with them the comments received and incorporated their input in the final environmental documents. we expect to find f.t.a. the final document. barring any delays on obtaining f.t.a. signature on final documents, we plan to submit the fire e.i.r.-e-i-s for your consideration at the board meeting. as you know, the san francisco county transportation authority board passed a resolution to suspend tgpa's $9.2 million extension 30% design. this suspension of funding will stay in place until the san francisco city controller's office conducts an audit of tgpa's management and delivers phase one and delivery of phase
7:20 am
two, the downtown extension. i will report to the commissioners that the tgpa welcomes this, as it will provide tgpa with valuable lessons learned. [inaudible] >> -- california high speed rail, and sfcta. we work with sfcta executive director, tilly chang, and the san francisco controller's office to complete these two efforts as soon as possible so that funding can be reinstated and work on the downtown extension can resume. moving onto transit center operations, as you know, all bus operations continues to be conducted from the temporary terminal. since the transit center's
7:21 am
temporarily closure, we took steps to reduce staffing levels on all our operational activities. we also developed a schedule of required ramp-up time so we can be ready to augment staff when the transit center is scheduled for reopening is developed. next month, we will present the board with impact the closure has had on our operational budget. we were working with pearl media, the advertising and social media time to rapidly start the social media and rapid response team once the park opens. we will be ready for a full schedule of park events as soon as the park reopens. later on today's agenda, we have another lease for your consideration. as you know, retail is one of the long-term strategies for generating revenues to fund
7:22 am
operations. our current operating projections for a stablized year is approximately $32 million. our projected revenues is approximately $18 million. the remaining $14 million will be generated from toll funds and operator subsidies. we expect to get approximately $11 million from toll funds and $3 million from the operator subsidies. in addition to generating revenue from retail and advertisement and other activities, we are also identifying efficiencies and looking for other revenue sources for the center. we'd like to close by saying i understand how important the transit center is to the bay area and the state. it's an economic driver for the neighborhood, creating direct and indirect jobs, generating sales tax revenue for the state
7:23 am
and the city and providing permanent jobs for people that need them. we will reopen as soon as possible, safely possible, so that the entire bay area can once again benefit from the investment they have made in the transbay program. directors, at this time, i would like to present with you the project leadership report, and then, i can take questions. dennis? >> thank you. good morning, directors. this will be our third quarter 2018 labor agreement. we go through labor and administration, labor statistics and finish out with the apprenticeship trend. we held our 26th joint administrative meeting on the 20th, went through our regular agenda. it was a fairly -- very straightforward meeting. very little report came in from the unions, and it was our first meeting with our new san francisco building commission --
7:24 am
building trades person, tim paulson. we went through apprenticeship programs. in regards with labor for q 3, there were no labor stoppage for incidents, but there were zero incidents, and of course no lost time in third quarter. person years, we do have our breakdown that we have throughout the bay area and central valley showing that we have about 5.5 million hours of labor. regarding the apprenticeships in this graph that we've been showing a while now, you can see the far right end, it really does show as the labor was ramping down, we still are holding that yellow line, greenish line, depending on how it looks on your monitors. they're providing the shift perthe p.l.a. still, and we're
7:25 am
essentially at 99.99% of the precincts reporting. also, on the bus storage facility, the construction company, they have achieved their apprenticeship goal. that completes my presentation. if there's any questions. >> questions? yes. >> quick comment. i just wanted to thank directza for coming to us and reporting
7:26 am
this. thank you. >> thank you. >> comment. >> yes, director -- >> i appreciate the peer review. i think we can always get better. i would just suggest, as i mentioned to director chang, we also do an apt peer review. apt has done peer review as they were here last week for caltrain. having autos set of experts looking at it from a -- having a different set of experts looking at it from a different set of eyes could benefit us. >> okay. >> comments on a similar line. i appreciate the report, thank you very much. i want to make sure we don't get focused on the o-rings, so to speak. i don't want us to focus on the issue that we're currently facing. i'm glg i'm going to have to face our board, the public, and the
7:27 am
entire facility. i appreciate the way this is being handled, but i have to double underline, if anything else happens, it will be something we can't potentially recover from. as i guess more involved with this board, i want to make sure we're looking through the entire facility to make sure nothing else happens. thank you. >> any other directors? thank you. >> director nuru, if the board is in agreement, i'll be happy to follow the advice of vice chair zee and do another review. >> i think it's good to have as many sets of i's that we have and dot all the i's and cross all the t's to make sure we don't have anything like that again. >> it may be worth coming back to the board. if you explore kind of coming back what that would look like, kind of scope and timeline. i think there could be great value in it. it could also be a very long and
7:28 am
slow process, so we may want to balance that, if that's the case, will it be effective if we get an answer a year from now. so just having an understanding of what that might look like, i think would be helpful. >> okay. you're also getting into very different set of issues as you're going into that project, so you might also want to look at them that way. >> okay. >> go ahead and call your next item, item six? >> yes, please. >> is an update on the closure and repair of the salesforce transit center. >> good morning, directors, ron
7:29 am
and i will present this. it'll be a combination of the shoring, repairs, closure update, and my presentation builds on previous items that you have seen in the past, but i leave them in there as reference, and ron will come up and reference on other items that are going on with the rest of the project, so we'll both be up here. so i bring this up as the bus deck, this red line is the two ghirardelliers since september 25 that we've been discussing. the two columns on the outside are the supporting columns and the one in the middle is the girder. the bus aisle is supported by
7:30 am
this. as we've seen, we did have that -- i bring this as reference of where this is at, the crack in the round area. that's what we call the flange. i will refer to that through various other signs. that's the bottom part. if you picture the girder as the i-beam, that would be the bottom part. this part is the web, and i'll refer to that, as well. [inaudible] >> -- to receipt lines are up there. what it looks like below in the train box are these two levels. this is what's -- the steel supports, those red items in there are jacks that are
7:31 am
applying a load to whatever the surface is above it, and in snugging it up so there can be a transfer of load so the repair can be made in there. when you come up to the ground level, this'll probably be the most recognizable because this is where most of the public can see. this has been in place now for a while. those similar jacks are in place as they are pushing up on the bus deck and taking about 70% of that load off of those girders. in the meantime, fremont street has been flowing with no issues since we opened it october 14. now up on the bus deck level, this is the shoring system that was installed. this is mainly what it happens since the last time. these are newer pictures. this is a system that's taking -- like i said, 70% off the girder that had the crooks.
7:32 am
some of those bracers or kickers out there is a seismic. there's a seismic criteria that's been built in that's at the full design capacity at this point. you know, the seismic or drift as some would call it has been totally built into this shoring system, and it's not being treats treated as a temporary in it to ensure the redundancy in it. so on the right-hand side, you see the pictures of what you're looking at is that flange. you can see the crack is to the left of a stiffener. if you go down to the base where it hits the flange, there happens to be the crack in that particular spot. if you refer to that item or
7:33 am
drawing or rendering on the left, you can see the purple or bluish, that's the sample area or cut lines. it was determined by both parties that it was very important to cut this out. we've done that for both girders at fremont street, so essentially we took out four samples, and i'll show you those a picture of. i do note on the rendering on the left, you see some pinkish purplish on the right-hand side of
7:34 am
7:35 am
fabricator, and the supplier. so we have everyone because that's been the only way we've been able to move forward is to ensure that all parties have that full access. so that was the operation. it's actually an amazing operation with a lot of pulleys that it works through, and was -- and those samples were taken out. and here's pictures of those samples out. each weighs somewhere around 600 pounds each. they're -- two of the four came completely apart, and those were up on the table at the left-hand picture where they're in two parts, but the ones on the pallets, on the right-hand side, were still intact, and those were shipped that way. we shipped t-- the smaller piecs were shipped air frath, and tei
7:36 am
the other ones were shipped ground freight. we had everyone -- all parties from the peer review, which is actually the peer review member who is in the picture here with the beard, and then, also, we had every one of those same contractors, fabricators, and the materials people, also, they had full access, and nothing was moved without making sure that everyone was aware of what was happening and was on board and agreed upon. so then, those, now have been shipped. they've all arrived -- i believe all of them have arrived now. if not, they'll be shortly. so this is that same rendering that i was referencing. this is that same one, just a little closer. you can now start seeing that there's individual little coupons, little pieces. that starts showing you -- it's almost multiple layers.
7:37 am
they'll do the exterior layer, the midpoint, the corner point. this is going to be sliezed up into many, many different pieces to perform the tests that are on the left-hand side. this is a list of all the tests that were agreed upon now that are moving forward as they machine all these little pieces and start the process of testing, which is started already, they will then go through this litany of different tests that they've all agreed on. once the tests are getting close to done, we're going to have another round on next wednesday where all parties are going to converge on l.p.i. to get that last chance, after maybe some initial results and inspections of these pieces, there may be additional testing that may be required that the peer review may want. maybe such the parties such as the fabricator or the materials person may need additional, depending on how initial test
7:38 am
results are coming out, so that's why there's a little bit of a process here, but we want to make sure we take the steps properly in everything we do and make sure everyone's involved. but there's a long list that will be done on all these samples. so for schedule, at least for -- this particular slide shows an as-billed in october and pretty much what's happening in november . it just pretty much showed -- this would be november 1 through 30 in this slide. it just shows things that would go on in december and beyond. it does show the as build as we opened fremont on october 14. we are done with our sampling. as the blue line would indicate, we are in the middle of that testing procedure. it does show two weeks, but additional may be required depending on what it shows us
7:39 am
next week. that gets us into the all very important element of findings and results. that's where we will get our root cause. once we get that root cause, then, that's where the finalization of the design and the actual fix comes from, so we're getting methodically to that step as efficiently as possible, and then, the design will be reviewed and approved by the peer review. just as a quick update on first street, similarly, that's where we have identical design over there. there still has been no cracks, no identified items looic thike found over there, but we continue to look in that area as well because of a similar design to ensure what is necessary, if anything for redundancy over there.
7:40 am
what we have in place is currently a three-level system of shoring that are ares at the train platform level and -- -- that are at the platform level. almost identical pictures below grade. it's essentially an identical design that's below grade at first street, and then, above grade, this is what it's been looking like since we installed those for stablization, and first street has not had any impacts since -- we did this work over night, and it's had zero impacts to rush hour or no impacts on first street with the split-lane configuration. what we've done, we did do a lot of nondestructive testing at first street to make sure there's no cracking, ultrasonic
7:41 am
7:44 am
>> good morning director. i want to recognize dennis and the engineers and the contractors for their hard work in a short time frame to address this problem. from day one, we had mapped the approach was going to be just stabilized and analyzed with benefit of pier review. we're on track in a measured manner i want to express my appreciation to the team for advancing that. we haven't lost sight that we want to finalize the phase one construction clos to close touts portion of the program. in terms of budget, we're in a slower burn than we had been. we committed $2.1 billion and
7:45 am
expanded it to $2.09 billion. that was about delta 6.7 in expenditures and 4.7 in committed over the last month. mostly attributed to the extended period to address the close out as well as capture some of the latter trade packages that are coming to closure or maturity. in terms of forecast, e.a.c. remains the same. there are no new risk to factor or new facts. issues you have the paving are clearly in the realm of warranty and should not impact e.a.c. we are from the process reviewing the history of those
7:46 am
matters to ensure we get the facts and understand the root causes of those issues. in terms of contingency use, it's little bit of a slow burn. we've had some light draws. mostly as i mentioned, the latter packages. the ercs and the low voltage systems that are wrapping up now and drawing down on some of the contingency. little bit of changes with d.b.i. in terms of their code code interpretation.
7:47 am
i want to remind or refresh on the contract close out status and methodology. close out process involves these main bullet points. we need to be in receipt of the warranties. the punch list must be completed and accepted commissioning and training systems completed and then full and final close out change orders for all the various trade packages associated with webcor's work. in terms how we're progressing through that, i think the work to complete list is a few thousand items. many which are accomplished by wewebcor.
7:48 am
we're starting to close out the punch list items. in summary fashion, where we stand in terms of the 42-43 trade packages associated with the project, we're at cusp closing out 10 trade packages. we're just buttoning up the full and final closeout change order resolving whatever remaining issues with webcor and the associated trade package subcontractor. seven trade packages will be nearly the same position. however, their activity is being protracted by the girder issue. 14 trade packages are not quite at the same level of readiness as the first 10 that i
7:49 am
mentioned. they're still chasing warranties or finishing up punch lists. they're nearing a closeout position but not quite there yet. then the remaining 11 trade packages we anticipate will be mired in some of the claim issues that had been run. we'll get into that more in closed session. that's pretty much it. just wanted to underscore that we haven't lost sight of closeout despite having to address the surprise of the beam condition. with that, i or dennis can address questions you may have. >> i have two questions for dennis or mark. the first is i understand that with regard to first street,
7:50 am
we've so far not found anything of concern the level of testing it will be different from fremont. maybe this premature to be expecting an answer for. do we expect that whatever the design solution is for fremont street, we'll be applying to first street regardless of the fact that we've not as of yet, identified any problems with first treat? >> i think it's premature to say that. i think very important element that we'll find out soon is those core samples. that's a very important element that will play into the matrix of solutions. we're not there yet. i wouldn't assume the same will be applied. will be what's felt -- the needed redundancy of first street. we're not there yet. >> okay. then the second question really following on director hursh's earlier comment, i know you made
7:51 am
reference to the load path, there were loads that when this happened were distributed in places that were not anticipated and not designed for us. i'm glad to hear that you're looking at that. it's a large structure with many other structural elements not impacted by this. we only found this fremont street issue si certain issue. to director hursh's point. it's important we're focusing we know there's a problem. could you talk about to what extent we're evaluating the rest of the facility, structural and nonstructural to provide the team, the board and public, the confidence that it's not just this one thing that we happen to find but that everything else is okay or if there are other
7:52 am
issues we need to address? >> director reiskin. we're working on that. we'll make an effort to independent any other location -- inspect any other locations in the building. we want to see what the cause is. there's structural analysis done on design team for the building. really to find out what other locations we need to explore, we need to wait for the findings. >> director reiskin: my point we only know of this issue because some astute workers happen to find it, well could have passed the ability of anyone to determine. we're very fortunate on that point. with the process now put in place, we can address this specific issue and any related
7:53 am
issues based on how the load shifted. my point wasn't related to what we found with this beam. it's other things -- i think given that we found this just by chance, i think, begs the question, what other things might there be in the building that we should be looking at, to make sure there's nothing else missed. >> you mean other things related to this? correct. >> we can go back and develop a strategy. ron mentioned some reports so that we're making sure they are done. closeout process make sure everything was done to plan. >> director reiskin: this issue, i think this is what director
7:54 am
hursh's point was, puts at stake the credibility of the whole program or the whole project. to overcome that, we do need some level of review of the whole facility. to make sure -- i have high level of confidence such a review would find that the facility is in good shape. i think having that review undertaken will be important in order to restore the credibility of the facility. >> without question. i think as we go through reviewing the history of what transpired and look at the qaqc documents, i think some data will emerge to give us a guiding light to follow as we look at the entire facility in terms of priority of what should we look at first and to what depth.
7:55 am
i suspect or anticipate that the findings that we'll have from looking at the history and the data that we have, whether to be steel related or otherwise in terms how the qaqc program played out, let the facts lead us through this. without question, we do have to review our facility. we just want to create a framework that's prioritized and focus in the right place in the right order. >> director reiskin: that's good to hear. it will be helpful to memorialize that review in the conclusions of it in some sort of document or deliverable so that we and the public have kind of a seal of approval that not only did we address this beam issue but we've reviewed the
7:56 am
rest of the facility and it's good to go. >> very good. >> i like to piggy back on director reiskin. i'm hearing, the board has suggested and prior meetings, there's two concurrent paths. absolutely need to focus on the repair and the analytics now. i don't want to see us get caught where through this process, the repairs are made but our operators saying i'm still not comfortable with the building. that we're not -- we have a building still not being used. that's what i heard director hursh suggest. the second path that has to be done concurrently since many of us here in the beginning, i like to hear a pier review panel on ,
7:57 am
report to us about the engineering work and design by thornton thomas as well as pier review panel two at m.t.c. looking back on the engineering and the design of the facility. to be able to come to us and public and say, everything was designed according to code, right safety factors, all that stuff. so the issue can be isolate on qaqc or mill work. it leaves one part of the question open about the engineering. was it done right? is it appropriate where all the things observed? both need to happen concurrently so we don't get caught the repairs are done and the operators are not comfortable yet operating.
7:58 am
>> i appreciate the director support of my recommendation. i apologize for being the new kid on the the block. i would suggest it needs to be agendized. we would like that report to come back. just to make it clear, we're currently carrying over 14,000 people a day to a temporary temper terminal. a bus operator have to explain why it's safe to come back. that should be the goal of this study is for us to be able to in plain language, explain to the customers and employees why it's safe and why we're comfortable going back in the facility. i appreciate your support. i would ask it be an agenda item for this group. >> one other comment. can you go to that slide about
7:59 am
next steps that you had prior to updating us on the budget? my understanding where the process now is everybody is kind of on board looking at l.p.i.'s work and there's a meeting come up when they report their findings. that includes everybody. webcor obayashi, skanska. what isn't in here what happens if that group doesn't necessarily agree with l.p.i.'s finding and wants to do additional testing. is that another threes to do additional testing. we go ahead without them doing the testing? >> that was what -- the peer review panel want some initial reports.
8:00 am
we'll know next wednesday. we'll have a meeting. we're meet acing at the l.p.i. . we'll know at that point if requiring additional testing. we'll figure out if that's parallel or if that hold up the process. it depends on the type of testing. it maybe just clarifying testing more than anything. it depends on what the test is. >> i imagine the expectations. here we are and here's the report, not everyone may agree with the report's finding. we need to make sure it gets done right. >> let me clarify, we're not going to go into the findings phase until all the parties are satisfied and all the testing has been completed. that's what dennis was alluding to.