i resolved all the issues there, aerodromnaya 2 to participate in the selection of samples of 110 kilovolt cables by testing representatives of the cable network branch. in particular, engineering and technical workers are involved in the cable sampling procedure, while an external inspection of the cable drum is performed. well, what does it mean to conduct supervision, in general, personally, i think that the operation of any power equipment begins at the stage of consideration and approval of a design solution. well, as representatives operating organizations must express their opinion regarding the correct and efficient operation of the roaming. and our opinion. it should be first of all, confirmed by the current regulatory and technical documents . at the moment , the drums with a 110 kv cable intended for laying a 110 kv cable line, kolyadichi aerodromnaya 2, are being unloaded at the construction site. so far, only the organization of construction begins here. well, while the drums are temporarily folded, samples are taken. a serious stage at which, among other things, the correct a