these were all completed in [inaudible] currently, we have vallejo and to broaden at agte b. oakland, alameda, harbor, at gate d. in undertaking the second phase of improvements, we are looking at the build out of potential. facilities at the ferry building area. that would include a new gate a, a new gate f, and a new gate g. one of the things that is shown in this map in darfur orange is areas that have to be reconstructed or filled. in the blue collars, arafat will be demolished. we are also reviewing this with bcdc staff and have undertaken steps to minimize the film, from a cost-effective point of view, but also from a responsible point of view. in the future, we are looking at, in the north basin, berkeley and richmond, which could trigger when gate e is constructed. we are looking at converting gate e, the one that held oakland, to its more treasure island service because of its direct route. we will have more space for the amlarger amount of queuing. and to move in alameda and oakland to gate f. g will serve as spare birth and for other things to come along at a later time, p