own working group in our supervisory board and after our approval , it will be notified to akan energy company to prepare the phases of phase one plans. the new airport will have a runway with the relevant taxiways without any restrictions for all flights and one 410,000 meter terminal and all the side buildings. that an airport needs is seen in phase two . it has 1 million and 100 thousand cubic meters of earthworks. this includes earthworks and excavation . so far, about 500,000 cubic meters of these volumes have actually been done, which has about 44 physical improvements in the project in the field of earthworks. with the registration of the largest air terminal in the country, the passenger capacity reaches 50 million people per year. this airport is going to. it should be built in a smart and green way and it will turn iran into an aviation hub in the region. in the special area economic and free commercial zone of the airport city, where industrial, commercial and high-tech activities are carried out , a route will be built for cargo from the southern part, which is the place for mainte