next year, god willing, but the third and final section, which is a four-kilometer route from al-ghadi boulevardegan highway, has been completed at 6 intersection points. we have non -homsad bridges, 4 kilometers of 200mm diameter pipes have been installed in the form of bridges and overpasses, which collect surface sound in the area , which is a big task in its own right. i will provide local access. with the opening of this big project, the neighborhood traffic of the 18th district, which is mainly heavy vehicles , has been transferred to the large road network and the travel time for people will be reduced to a great extent. azadegan to ahan bazaar may be less. from five to six minutes, you have easy access. well, this is a big event. well, how long was it before? if you wanted to drive through this 4-kilometer section before the opening, it might take up to half an hour, and here is the end of this 9-kilometer highway, where it connects to azadegan highway and sabe road, and from the next few days, this access will be for people will open too, fatemeh hanrour, radio news, experts and scienti