well, the alchevsk iron and steel works supplied steel sheets. nding on the thickness of the metal, we adjust the speed, the order for production at this plant was received at the end of november and within a month. more than 45,000 tons were completed ahead of schedule in the production of large diameter pipes. also for water supply networks, and for gas pipelines of oil pipelines the whole team. uh is ready to work for a common cause, ready to raise production to increase the production of problem products. donetsk region, not by hearsay familiar to crimea in 2014, the peninsula also found itself in a water blockade after ukraine blocked the north crimean canal viktor tarasenko, honorary president of the crimean academy of sciences , an internationally known ecologist believes that the construction of water conduits. this is a modern and more relevant reading of the old approaches, when, at the cost of incredible efforts , man-made rivers were laid ; according to the scientist every year. everything is lower, this is not the canal bed, as all th