the entrance. but it was sometimes difficult for the driver to get there on the straight zadonsk alekseevkan the wheel had to be changed, now it’s easier, by october 23, a 9 km long road was restored, the road surface was replaced with new two-layer asphalt concrete, stopping points were replaced, 333 km were repaired , here are some of them... roads are becoming safer for pedestrians, as in veliky novgorod on meritskova-volosovo street, after repairs there are more speed bumps. the kremlin park is within walking distance, a large number of pedestrians move around, there was one artificial road unevenness, we ended up making two, well, in principle, according to the proposals of the state traffic inspectorate. in total, thanks to the national project , 360 sections of roads to tourist attractions were updated in the country last year, and this is more... than it was destroyed by these fishermen, i don’t want to go to your olympics, i want to kill vitya, you have little pity, you don’t care about your father you won’t return it, game, let’s do it, training four times a week, three running, o