alenavna, it’s better to explain, you carried out the acceptance of these works last year, right? these jambs were not there, they surfaced later, well, a year later, yes, a year later operation, just began to sag, vertical training, apparently, was done poorly, it was attached. the uniqueness of this facility lies in the fact that it is under extended kazan support, this is actually continuous control, during which we have the opportunity, almost daily, to watch how construction is carried out and how work is accepted, because some shortcomings are visible through some time, they are hidden, since the beginning of construction more than seventy inspections, more than two dozen of them by specialists from the central apparatus of the federal treasury. i would ask you to stay here, too, we have the same situation on all floors in the basement. the buildings are shrinking, that’s why such things arise, it’s all a printtract, that’s why it’s all sub-river, the roads here are generally very complex , i see they are vertical and horizontal, maybe some kind of beacons will be needed, th