treatment facilities are being built now, when finished, what this will give the resort will tell alexander ivanchenkoo dive more than 20 m and divers follow the bottom, which will pass deep-water release of new treatment facilities, the most difficult section with rocky ground has been passed. two teams of divers, four people each, while people pass through the pro-chamber, divers rest, then the next pair and continue for two days will finish installation, 13 fly depths. now we are at the junction of 22 m at the end of 26 m flies, the last 17, damn it, will be. uh depth, 30 to 37 mm, meanwhile , two floating cranes and two tugboats are working above the water, the length of the deep-sea outlet is 1734 m. he there will be seventeen so-called lashes, each delivered by sea to gelendzhik from tamamania, in parallel with this, work is underway to replace collectors, install new utilities and build reservoirs. readiness for the first stage is about 20-25% concrete is already being poured. we are planning on-site facilities according to the schedule, and prepare for the installation of equipment by december