but stanter wants to leave the old term of architect anastasia open, but alexander kudrin has construction are fears that the deadline goes only to the level of the ceiling of the first floor, beyond the frame. here is the beam the horizontal one, on which the rafters lie , and on which it is actually fixed to the clapboard, and since we now need to build a new truss system, we need a point on which they will rest to be fixed. unfortunately, we can’t go to the same clapboard, so as the idea was to place additional racks, but then we’ll make the frontal beam and put a new rafter ugly on historical logs, we should leave this. we must see this contrast between the new and the old. he must be here sound on parole, that is, in winter with a full snow load. if there is a snowy winter, it won't last, don't worry. i am here now , i have it now there, as it were, like a quasi-module. i'm not ready for this. no, look, we can leave the logs, but the point is that you need to get the support posts. they need at least three. here we go two racks, they are practically sewn into the walls along the edges