what has already been done today was shown to journalists for the first time, a report by alexei ivanova krymskynow again the construction site overpass restores around the clock. there are 400 people here, builders, engineers working 40 pieces of equipment, first of all cranes someone is the place where the terrorist attack on the crimean bridge took place, the place itself is not visible. it is now in the water, but the power of the explosive was such that this metal span tore it apart. well, now this is the most difficult section in the dismantling process. it can be seen that this span. and by the way, two spans. here they literally hang over the sea. now they are temporarily fixed with the help of metal structures. well, then they will take turns cutting off first this part, then that load overlay cranes. well, with the help of floating screens, they will also raise the rest according to the plans of the ministry of construction. the entire dismantling process should be completed before the new year, the workers now have to carry out these dismantling works in such difficult conditions, fir