alexey konor.ow they sealed the seams there, first with a simple sealant, and then covered it with a solution on top, bolshaya akademicheskaya 25, the overhaul period is coming to an end, the house should be handed over in 2 weeks, but there is no end to the work, the stage of devastation and we need to restore the house, at least to that state when these workers came here inside, as if the house survived the apocalypse is not worth it because of the technology. but now the window sill rests on a single piece of concrete delivered to a teenager in the porches, from the walls, put down new plaster, they didn’t even start the pipes in the basement, they shifted it haphazardly instead of the normal back rubber insulation, which was black insulated and back polyethylene, which is half the price. the most important thing is electrical. no, even the back wall of the boards is not connected to consumers. that is, this is just a decoration, while the contractors reported, and the capital repair fund accept