. >> i am aliza and i am here to speak on the construction analysis. we believe that the construction analysis on the 480 project and stand in the smaller project and the data can tread well and rolo dated december 14th, has determined the declaration on the project and it appears to be on a design with the excavation and the project that is described as the six story building and the mixed use building and the 16 foot excavation. the records show that the review for the project that the 16th at the excavation, sorry. and it is written in 2000 was used for the preparation of the environmental analysis that resulted in the 2012 next declaration and the new faith one esi was written in january of 2013 which postdates the negative declaration that dates on the 2004 report for the five story senior resident that concern us. and the firm that did the analysis was extremely concerned about the potential damage of the vibrations to the nearby buildings including the club and the excavation phase and... (inaudible) to prevent it from damage in the phase when i