embankment , in parallel with this, asphalt pavers, rollers level the road, a route connecting altufevskoyeskoye highway will pass here. this means several districts with each other otradnoe to beskudnikov, degunin or anozovo. at this stage, the construction of roads in the amount of 70% has been completed. also arrangement of adjacent landscaping in the amount of 32.000 m², and within the framework of the implementation of the object , engineering communications are provided for, such as rainwater sewer networks, heating networks a and the installation of a new network, lighting and an automated traffic control system. it so happened that the capital is literally cut up by railroad tracks, up and down for motorists. they become an obstacle such roads as it is needed in order not to detour tracks through many kilometers of traffic jams in order to build this train road we decided to launch it, as it were, over the future traffic flow, that is, the cars will go to this place where the equipment works, and the trains along the two overpasses that have already been built bridges for trains wer