amounto do the maximum with they, would -- bare minimum of tools. building each caravan takes two weeks to assemble and finish. is we insulate the box. and then we -- with aluminum. it is a soft aluminum. we have to be careful in the shop. if we get the side of the trailer, we have to pull that piece of skin off and put a new one on. it is working very precisely and carefully. it is never good enough. myself,re britain and it would be pretty nice but with cody in the mix, we are unbelievably over-the-top. thehis just came back from power colder. der. we just that frame up, put the wheels on. colin starts making the side doors and then we work on the rear hatch door area -- hatch door. that, the finishing details. we put in some trim. add the switches. the lights. fan. beautiful. all three speeds. that, we peel all of the protective plastic off of the aluminum. -- put on theal decal. to put very last step is the hubcaps on. he cut they are chrome, we want them to be no scratches. we just put them on and it goes pop. that is a relief. now we can get o