anadra coal mines, and the rest will soon be delivered along the rivers la markova, ustbeloye, snezhnoye, vaege, krasnino and konchilan. tanker chukotka plus the first in the waters of the annadorsky estuary chukotka this year. the vessel egvekinot with a cargo of almost 4,500 tons approached the shores of the village of khatyrka on june 4, but due to difficult ice conditions it was unable to unload. therefore, the holding went to the villages of serenniki, nunli gran, enmelen. this year we plan to produce 30,000 tons more diesel fuel compared to 2023. in total, our navigation volume is about 170,000 tons of fuel, of which 130 tons is diesel fuel, that’s all the rest is various gasolines ai92 and 95 aircraft fuel for jet engines. the increase in the delivery plan by 30,000 tons of diesel fuel is due to the fact that according to the project , a new power plant should start operating in belibino this year. and there will be an additional volume of diesel fuel required. in the navigation of 2024, there will be about 25 ship calls in the district, most of them are in the port of pivek, we have our main oil depot there , but there will be three ship calls to port anadr, two ship calls to port