the design was concluded on december 9, 2002, andaugust 12,t commission approved the concept design. the concept design was again reviewed on july 6 and september 14, 2009, becoming the basis for the project described in the environmental analysis, located in the south beach waterfront. this is an image of the original concept design that was put forward in 2002. the wharf will be a new open space, connected to the prominent on the south edge of 32. an area that is currently characterized by dilapidated and failing whorf sections. the new war will have a light shade, adding a 10. section in widening to about 140 feet at the south and the pier 36. the major project components are too rigid include a major neighborhood green. think of it as a new waterfront commons for the south beach area. two, afloat for small craft. third, interpretive elements that interact with and described the bay environment. the project will demolish the condemned pure 36, including the war between piers 32 m 38. as discussed in the environmental document. constructing a concrete support of war for along the l