how the assembly is going on was shown to the film crew of channel one, andrey golubev's report here it is a new russian swallow, our film crew was the first to be allowed into production. now the assembly is in progress first wagon. it is not yet in its final form, but you can already see what has changed is the new design of the front end, you can see that it will be more streamlined and with improved aerodynamic properties. new train. we are shown by one of its creators grigory golubev at the plant, he is with the foundation. and when they started to produce a familiar swallow, now next to the old new model called the bridge in the first place. the key difference from the two electric trains is that the new a train will have traction equipment of a russian manufacturer is here. as you can see, there are already prepared places for the installation of a traction converter, where there were, well, which the ural engineers will come to us at the plant in may. share on how to make the electric train completely russian. first of all, we created our own central control system, and this