, maxim kalashnikov found out that this is the petushinsky district north of the village, the old annino has been here since april 25 on a one and a half kilometer segment. the first stage of laying the upper road surface has begun this year for the builders. it is necessary to lay 65 km of the road. moscow kazan-yekaterinburg. three layers of asphalt pavement. the total thickness is 28 cm. this is 900,000 tons. mixes are currently working at the facility, about 40 pieces of asphalt equipment near-circuit complex composition. uh, out of five rollers plus from dump trucks that deliver the mixture , we are currently working from two asphalt concrete plants. here we are laying about 2,000 tons of shifts after the completion of the construction of highways, the road builders will have to repair 640 km. regional and local roads that were damaged by construction equipment, an agreement on this has already been reached, declares the amount of funding in the administration of the vladimir region. we declared about 5.4 billion rubles. it will be required in order to restore these more than 600 ki