you can reconnect 85 or, dresser the interchange to de anza heading up to fremont. as you can see, currently, this has no impact on the traffic would agree to show another broadway sensors. on the bay bridge we have not seen any metering lights activity. so far, a beautiful morning with good conditions. look at the golden gate, it easy ride in from as a through marin county for one of one southbound this morning. there were earlier occurring problems on the nimitz in oakland, northbound et at high street. >> they just removed a big rig from the scene into temporarily had to shut down the exit. you can see the remnants of the accident. the black spot on the roadways the diesel. fortunately that part was already blocked off to the traffic. the construction area has been there for two-three months. the concrete barriers allowed them to work quickly. the driver of a big rig carrying mail lost control and slammed into plastic barrels. that caused him to basically go along this concrete barrier for about 40 ft.. instead, most of his big rig was of a construction site. not