. >> it is e-mailed back and forth, with the apell lant? appellant. >> the e-mail communication. >> the second issue is the fan. deeply on the fan to replace it and the same 6-foot fans and i found that the fans were 4-foot high and so we will revise the permit application or put in a new application to change it to 4-foot chain link fence because it was a chain link fence because we are going to replace or repair as required. the third thing that we have and the third thing that we have right here is the rain water litter. the situation is the rain water litter is one litter comes down, shared by two buildings. and it is this charged to the appellant's property. on the plan we replace the rain water litter and my client, tell me that they would like to split it into two. and when that company did it, the one, and going to out, probably. and at the moment they accept this or not. and the let's see... the door on the third floor, on the last plan we submit, the one that the second appeal, we put in, we put the door in and no, we kept the doo