. >> armonk the construction update with steve roluhle. >> good morning, directors. -- now we have the construction update. it was a good month. a couple of major milestones reached, and that was first street bridge getting put in over memorial day weekend quite successfully. we have good information on that. the other great achievement was actually getting five but to shaft's done in a single week, and average has been between three and for now. that production has stepped up. unfortunately we did have a recordable in the bond month of. it burned a welder. corrective actions have been taken with regards to that. he wiped his sleeve with iraq that had flammable material on it, which he did not realize at the time. fortunately was a very insignificant incident. he was able to return to work. we also had a near miss, an apprentice operator who has been since receiving additional training and fortunately pulled up a cedar cable for the temporary electrical system, so that needs to be corrected as well, but fortunately there were no injuries whatsoever in that incident. the buttress shafts