major repairs in the west karun refinery are in the final stages, according to the ceo of oil and gas arundan, crude oil is used from one of the new sepehr and johar fields. in this case, these fields are shared with the country of iraq, at the last point in the west of the country, bordering with the country of iraq . the sugar factory does a lot a strategy that is prepared with major repairs to receive the oil of separ and jafari fields, and the purpose is to receive the breath of sepehar, which increases the capacity of this program, we have 35 days, which started from 44, and major repairs, repair of the damaged spinal cord , calibration of mini valves it is hard and difficult in the heat of august in ahvaz, where the temperature sometimes rises above 150 degrees, going inside the wind-blown tank of the towers at a height of 20 meters and doing basic repairs is a very tiring task. we can endure it for half an hour. let's eat, then you can do it, you won't notice the heat and the soil that rises will be completed within the schedule so that we do not fall behind in the competition with nei