re-equipment of avtovo tets is one of the links in a gradual one. planned modernization of the entirethe service life of the central units is designed for 30-40 years. development industry, urbanization requires ever greater capacity and greater efficiency. on this project, for the first time , a modernized turbine of our strategic historical partner , the ural turbine plant, with increased power was used. everything, accordingly, we had to produce a turbogenerator with a capacity not of 110 or 125 mw, as was usually used in this kind of supply, but a 130 megawatt machine, this required a complete redesign of the active core , a new core, a stator winding, a new rotor were designed, for in order for the turbogenerator to fit into transport dimensions and in order to meet the requirements for the installation weight... of components, we changed the layout of the machine, the gas coolers were removed from the turbogenerator housing, they were designed as a separate unit, this turbine, manufactured in the urals, became only more powerful, other characteristics related to reliability and