azad vacht, one of the issues that exists is the issue of width allocation for units . which is dependenttheir production anyway how much does this depth of internal construction help in providing raw materials from other countries? will it be a criterion for allocating width to these units ? yes, exactly, you mentioned a very important point , as you know, the units that are deep. as a rule, they have a high construction , they should use a smaller width than the production units that have a lower construction depth. for this purpose, we ourselves considered that the percentage of construction depth that friends and production units could contract from the construction depth system of the scientific-industrial organization behind it should be a criterion in order to prioritize the allocation of their width for production units. and the items that are considered by the scientific assistant, one of the items that is mentioned as determining the index for determining horizontal priorities is the same percentage of construction depth that we can benefit from this and our production units tha