kalining will also have its own baltic higher school of music and theater arts. l also begin operating, which will become a branch of the bolshoi theater. you and i are on the seventh floor of the museum building, and this is the administrative part of the building, the tower, the seventh floor, here we have a view of the high school and the opera and ballet theater, the future of the building, which will also be in this museum cluster theatrical. this is technical readiness , which means 70-75%, yes, although the complex is still under construction, this secondary school, which is part of it, is already working, it opened in 2021. well, today we have so much, we couldn’t, but in general it should be recessed by 2 mm, well, it’s not safe, it’s very traumatic, maybe this work has already been paid for, the donation has been paid for, yes, the preliminary amount is 63 million, yes 63 million. in other words, the object was handed over, the commission accepted it, allowed classes to begin, now suddenly, deficiencies were revealed, but this is also connected with subs