an understanding between the ministry the force and organization of basij mustazafein was concluded, the first phase of 7138 villages was signed, 3500 of these 7128 were assigned to basij mustazafein, 3500 villages that started from last year's events , 1100 villages were completed and the return of people to the village increased, the drinking water network of the village is finally this network had a collaboration over the years out of 70 water pumps have been installed, we have no problems, thank god it is too much, thank god, your hand is not sore. compared to the last two days, it is much better. in these projects, about 4 kilometers of transmission lines have been built and more than 100,000 cubic meters of water tanks have been provided, and 118 wells have been provided. basij water supply will be provided for three years in cooperation with the ministry of energy and basij jihadi groups. yazidin, the main source of the news agency and reuters , reported the wandering and indecision of hundreds of immigrants in new york, the united states. in front of the center for reviewing