quickly, on projects themselves, the central bayside system improvement rfp is out. on the street, bids are due next three, november 15. very exciting. after this project, which was previously known as the channel tunnel. we changed the name is basically because we have a lot of basic functions being incorporated into this. we have the north basin, a central basin, and they creek basin. we will get the functions and will be taking care of localized flooding in challenges from a climate change. after that rfp comes in, we will then be putting out the long looked forward to southeast improvement digest rfp, and that is currently being asked of. we're taking advantage of having this wonderful expertise, working with our team, and working with that rfp to have a very clear message so we get great proposals. our schedule forr current tasks, fp is due november 15. the southeast improvement rfp would go out around the yard. watershed characterization's will take about a year, but we are doing a fast pace in terms of identifying what projects we would need. we need to fix ou