reinforcing rod outside the structure, wrote this up and sent it to the main contractor, said it on to bechtel, the construction manager on the job that went to transcanada. a lot of what was covered up, frozen concrete, there was several times that transcanada came into view the work said it's a case in the middle of nowhere. don't worry about it. they covered it up and went on. moly integrity tells me that you can't do that. we can't allow things to be built that aren't according to the proper specifications. the pump station, which had the largest leak was on an island in north dakota, surrounded by what plans. we watched the destruction of wetlands while they were doing construction with no regard, reported as environmental problems. transcanada did nothing. they didn't care. then we get to the piping. the piping had come from china. what about the jobs that were lost in the united states? our steel mills? we need those jobs here. you go to weld on to the pipe and splits and breaks. and they get those reports that says the point is good. the problem is none of us can read chinese. please,