also, not every ground-floortinnant may befloore impacted.even are leased by tenants that are type one and type one is smoke and grease and of the seven, four are currently impacted because they are at a point in their design work where specific information is needed to move forward. the rest are not as far along, so impacts to the schedule will be assessed when a decision is made as to the exhaust system type with the ultimate goal of opening as soon as possible. as such, the timing of receipt for the fiscal year will continue. this is the last slide. the approach is considered are centralized, decentralized or a dom bcombination. whichever system is selected, aside from functionality and cost, also taken into consideration is tha that this n investment needed to be scaled to future needs and not limit future potential. as noted earlier with utilities, water, gas, electricity and they're being looked at as a part of the same exercise that the distribution needs to be reconfigured to meet the lay-out of the spaces. and it should be noted that