already added in production volumes by five percent, compared with the start of 22 , bel neftekhim iseling off and an increase of three percent. broken ties with european suppliers of materials and components made us think that partners should be sought primarily in the post-soviet space and as a result of well-coordinated joint work. the first engine of 2,500 horsepower was manufactured at the transmashholding kolomna enterprise, it is installed on a mining dump truck with a payload capacity of 220 tons . tests, after which a large car will go to the kemerovo region, and there are many such examples in a year. and cooperation and profitable partnership svetlana luk. our industry has been operating in the mode of obstacles and solving complex problems for two years now. first , covid broke supply chains and changed the pool of suppliers, then the sanctions again forced them to choose new routes and markets . and at least a billion export products. it needed to be refocused. and that means negotiating with new buyers. and i must say, everything was done here the ministry of industry em