projects, the task set by the president, what needs to be done for this, dmitry oreshkin found out belokamenkavillage, murmansk region, there is a center for the construction of large-capacity offshore structures, it is also called a factory for the production of factories. this is the first in the world. an enterprise where natural gas liquefaction lines are built on the basis of gravity type, that is, the platform is held on on the seabed, due to their own weight and the connection of the lower part with the ground, the floating giants will go from here to the deposits . 20,000 people work here on the coast of the polish peninsula . today, in the world of investment of a trillion rubles, an enterprise can simultaneously build two lines for liquefying natural gas. starting next year , dry dog will be released here for the first line of the next project. this is a high-tech production, and based on almost everything domestic. e, this pleases and it says that it is difficult with the conditions. we can do everything. this is a good position in this industry, but the new plant will, of course,