in addition, today at the benyakoni crossing , scheduled maintenance work is being carried out on theply, so the only route to lithuania passes through the stone ravine. if a week ago the line of trucks at this crossing was about 700 trucks, today it already reaches 1,300. over the past 24 hours, the neighboring side has registered only 70 cars instead. possible 500, the queue is critical, i came here to the border, i registered on the twenty-ninth , i just got here last night, and what are you bringing, from belarus these are tickets like those for the czech republic, the client is already calling, refusing the goods, and why have i been standing here for 2 weeks, they processed it in 3 seconds , they processed it yesterday, i just arrived, well, 15 minutes, that's all, that's the whole headache. in connection with the cessation of entry by the lithuanian side from march 1, 2024 through customs checkpoints adjacent to our camp and landing area, this means that traffic flows have increased. to the remaining two checkpoints remaining on the lithuanian-belarusian border, as well as on t