for a long time, this house on beruta street was also on the unenviable list., cracks, mold - well unpresentable appearance, stairs, well, the blind area has all fallen into disrepair. builders were busy working on the house, and the wind was blowing through the walls of the panels, which had long since become leaky, and the residents were divided. the private contractor who took on the renovation of this house did not calculate his strength. at first. i tried to enter the house according to an already proven scheme through descent complexes, and then stopped work altogether. the customer tried to influence the situation on his own, but the fight against inaction was resolved by... a wealthy contractor, but in during the construction process, apparently, there is a lack of some possible working capital, labor reserves, well, it turns out that during the construction process, he cannot, according to the contract, ensure the fulfillment of the obligations for which he has assumed. new roof, fresh facades. the only thing left to do with the utility network is to r