big ring, more than 70% ready. work at the station itself printers have already reached the finish line about what is happening on the site marina gromova gray glossy graniteely shine and shimmer while it is a building dust worker just started finishing, but already approximately. it’s clear what the pechatniki station will be like if it’s very clear, then here is the project of the future platform monochrome gamma and black accent letter p reference to the name the design of the station continues the single concept of the large circle line, architectural finishing work is underway, we are laying granite tiles, we are assembling facade panels. the entire subsystem for the facades has been completed almost along the platform and we are installing engineering systems . three excavators have been installed at the station. and we are preparing for the installation of six more in parallel continue monolithic work. pechatniki is a shallow station, its depth is 30 m. that is, now the platforms can be seen in the sky, and then, of course, all this will be covered with soil. well, and by the way, while in the light of the sun you can clearly see the tunnel, not two