one of our early upfront project is the biosolids project. we are looking to put on an rfp to have a consultant team to work collaborative lee with city staff, who would work with us to document and proof each decision that we make, so that we could bring a full project back to the commission saying this is our alternative, this is how we want to proceed with the analysis. we have a little ways to go. internally, process engineers have tested and feel confident. we hope to send a team to look at the installations. because we have been lucky to spend so much time with the neighbors, we are able to be attuned to issues about noise, traffic, odors, anything that would be perceived as a negative, and we want to be able to mitigate. these are the things that i am repeating to everyone on our team to read going, seeing, knowing, talking to the designers on the other end. d.c. is great, but they do not have anything built. the one thing that was mentioned to me, biodiesel. we are pretty much the only ones doing the complete cycle. we do get approach