bloc, we see a very interested, i would say even mobilized, position of the bugladezh authorities, bladezhsky general, we will justify this trust, we will do everything to justify it. the nuclear power plant is being built 160 km from dhaka, the capital of the state. the project is unique; it was developed specifically for this area. the climatic conditions here are difficult: regularly in bangladesh powerful cyclones hit, which... the station will operate on the most modern and efficient nuclear fuel, it was delivered to the horn six months ago, during which time a colossal amount of work has been done to ensure safety. also, russian nuclear scientists plan to increase the fuel cycle from a year to one and a half, which means economic efficiency will increase even more. there are thousands of people on the construction site, work on the first and second power units is going on in parallel, hundreds of kilometers of wires have been laid, 1.0 tons have been installed metal structures maintain a high pace, despite the prohibitive humidity of almost +40 outside, inside, where the fitters and ass