phase twphase two will be 12 blm luola to you'r irving within the existing green space and incorporates a curbside inlet from the street, pipes it into the rain garden and allows it to soak into the landscape before it enters our combined sewer. we received two bids in june and we recently issued ntp to the low bidder in late september. the north shore push station is 35 years old and due for a major upgrade with four existing dry-weather lift pumps and allows for them to operate as redundant wet-weather pumping, providing wet weather conditions. this project will include improvements to the bar screen, as well as an overhaul to other systems, including the electrical, push controls and distributed control systems. and this project was advertised and was slated to start construction in september, but, unfortunately, due to overall safety program concerns, we have elected to close the bidding and we will bring forward a prequalification process to validate bidders before soliciting for actual bids. >> i was going to clarify why we are pausing these projects, because we're working with th