inspection to clarify all the details of what happened and for the action of the developer on bolshaya koltsovoy train lines. they walked for almost 2 hours from the innovatorskaya station to aminevskaya, the drilling machine , which worked directly above the tunnel between the bkl stations, made a hole in the ground and clay and sand remained to merge onto the rail, according to the information of the moscow diplomatic transport, the developer allegedly did not coordinate with the metro and immediately after damage to the tunnel train traffic was stopped. well, here's the inside . they continued to walk passengers. we could use alternative routes, although it, of course, was longer. we believe that there really should be a criminal case for a company that has violated every conceivable and unimaginable requirement. e from the legislation and the lack of coordination with the metro suggests that the careless behavior of the construction organization from above during the construction of a heavy complex led to such consequences. by decision of the moscow state supervision authority , all work at